CONTRACT NOW-66-0454, FILE REF. JG-1967

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
05751069
Release Decision: 
RIPPUB
Original Classification: 
U
Document Page Count: 
2
Document Creation Date: 
March 9, 2023
Document Release Date: 
February 10, 2021
Sequence Number: 
Case Number: 
F-2011-01575
Publication Date: 
April 25, 1967
File: 
Body: 
Approved for Release: 2021/01/11 C05751069 12SA-/790'67 I Post Office Box 490 Greenville, Texas 75401 25 April 1967 In Reply Refer To: 8432-60350C-143 REGISTERED SUBJECT TO Contract NOw-66-0454, File Ref. JG-1967 (b)(3) ATTENTION Contracting Officer Reference is made to our letter 8432-60350C-120, dated 22 March 1967, in which we requested additional funds and an extension in the period of per- formance to 30 April 1967. Regretfully, the Contractor must request that the period of performance be extended to 30 June 1967, as this is our best estimate for delivery of a qualified aircraft at this time. Unfortunately, any extension necessitates increased costs, thus we must revise our estimate at complete. Previous estimate of schedule slippage was based upon having an operable Inertial Navigation System installed in the project aircraft by 1 March 1967. Repeated technical difficulties with the Inertial System has resulted in its being installed and flown on 13 April. The integration of this Inertial System with the Loran and the Weapons Delivery Systems yet remains to be accomplished. It is now estimated that on a two flight per week basis, the portion of the flight test program based at Greenville, Texas, can be accom- plished by 14 June 1967; the off-site or Patuxent River based tests will occur 15 through 30 June. C.,FOUF EXCIII-DED F.?,C" -03TATIC DOWN'' ADING PAD LAsFCATO Th14 t):tiliroy)e,sit contelna information f tIng tha MatiGasi ClefertrocW f4t UttKad Stigcs within the meaning ci La4S, nth, In U. 5.c. Sections 793 anti 794. ill tisslon jrllte ravelatio ot Its cootehta agy masf,er th s usasthu tti parsoaa proeibited by law. E 1- / Approved for Release: 2021/01/11 C05751069 Approved for Release: 2021/01/11 C05751069 8432-60350C-143 Page 2 25 April 1967 The technical problems encountered in both the Inertial and Loran Systems have necessitated their being returned to their respective manufacturers' plants for repair and/or modification on numerous occasions. These periods of time necessitates series increasing of the flight test schedule since parallel testing had reached the point it was not economical or technically feasible to proceed without these two essential systems. The costs stated herein have been discussed with your Technical Representative on his last visit to this facility on 4 April 1967. Expended through February (Costs) $ 2,555,158. Estimated March * 110,000.(excluded spares) Estimated April 107,000. Estimated May 100,000. Estimated June 90,000. $ 2,962,158. Spares 66,000. Estimated Costs $ 3,028,158. * March Actuals were $109,613. We respectfully request that the contract be amended to reflect the following: A. Period of performance be changed to 30 June 1967. B. Estimated Costs $3,028,158. 2 4, -s �5 "2 Fixed Fee 198,981. , Estimated Costs Plus Fixed Fee $3,227,139. This request for funds is based on your telephone conversation with Mr. C. F. Wilson, in which you stated that the changes referred to in our aforementioned letter will be covered in the amendment being prepared at this time. Should further information or clarification be required, please contact Mr. Wilson. D. L. Hearn Vice President and General Manager EHB:lw Approved for Release: 2021/01/11 C05751069