CHIGOE MEETING WITH U. S. NAVY

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
05752582
Release Decision: 
RIPPUB
Original Classification: 
U
Document Page Count: 
3
Document Creation Date: 
March 9, 2023
Document Release Date: 
February 10, 2021
Sequence Number: 
Case Number: 
F-2011-01575
Publication Date: 
March 4, 1966
File: 
AttachmentSize
PDF icon CHIGOE MEETING WITH U. S.[15863394].pdf319.63 KB
Body: 
Approved for Release: 2021/01/11 C05752582 � OA-1127-66 4 March 1966 MEMORAWD THE RECORD SUBJECT:: CH OON Meeting with V. S. Wavy 1. A meeting was held at Main Navy this date, 4 March 1966, in reference to U. S. Navy support to project CHIGOE. The following personnel attended: Adm. Christenson Adm. "Fawkes Adm., Smith Capt. Doolin Capt. Wilson Capt. Craven Mr. James A. Cunningham, Jr. Mr. William Kotapish Lt . Col. Seward A (b)(3) Otradr. llolcOmb warret Lt. V. A. Mattarazza also attended a detailed eaten after the main meeting. Capt ic Wilson put the meeting in perspective by saying that this was to discuss a Navy in-house capability to respond to typical classified requirements which may be generated by the Agency. It is to establish a general post- ure in the Navy to respond to requirements of this nature. The CHIGOE project is merely the to get the entire system started and working. 3. Mr. gotapish gave the Security briefing in which he said, in effect, that this project would not be included in the Inflow system (D?MUS system not being named sPecifi- cally) but would follow the same criteria. Security control would he exercised through OSA Security and from, the Navy side would be funneled through Capt. Wilson's office. Capt. Wils s office is REWSON. 4 theii Save 2' brief history of the authorize- (b)(3) tion of this project which had emanated :iron the DCI end the Deputy Secretary of Defense, through Ee emphasized (b)(3) t,It01.2.) 1 Exciude 1,0:.1 automatic clownglading and deciassifimtian pproved for Release: 2021/01/11 C05752582 Approved for Release: 2021/01/11 C05752582 cirp,17-11 OSA-1 c7-66 Page cally For this Drogran. t- thia proposa- A in July of tai n the mys In the Z.1. an test period- 7' re ver i81, ill be an ezceiIe,fl vy flight, and- maintenane btitty to-develop then we Is and how se plan to made the ,.point that 101,1, and, specifi program was developed. support early in the unusually receptive 'ght learnbow to participate e deployment for tit ded e and 1 igh verse rds will h will rt and exchange of yndthevy. In nt a message hat they own NEWSOM), fes, W111 sill be the We 4e not plan to clear the Nary or tRtenaee erevs at the ClIZOON III le tki tie. It appears unnecessary to do SAO a any time in the test progrmm. 4'71 r Approved for Release: 2021/01/11 C05752582 Approved for Release: 2021/01/11 C05752582 r - g. and Judo he ca n take a .this progr s the Prvgra prjet. 127-64 3 that we bri so tha d aneing eehnel ide to his problems, or the Army MOHAWK teletype tetork 1 s of SL 1' port. vy Nateri tation or ard must be transfrred Vale. he paperwork within at Patuxent River now subject of transfer of n -a separate -memo- S.parts ile t wil er Naval 'hip. her led nuc1aei11e Approved for Release: 2021/01/11 C05752582