ACCIDENT REPORT ON #357

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
06035528
Release Decision: 
RIPPUB
Original Classification: 
U
Document Page Count: 
2
Document Creation Date: 
December 28, 2022
Document Release Date: 
November 28, 2017
Sequence Number: 
Case Number: 
F-2016-00885
Publication Date: 
January 22, 1957
File: 
Body: 
Approved for Release: 2017/11/27 006035528 � AM Page 1 of 2 � V14);- Operations Accident Report on #357 1. Headquarters has reviewed the accident report submitted by letter of transmittal dated 11 January 1957. le.S are in general concurrence with recommended action. 2. Specifically, Headquarters is taking precautions to negate am future similar occurrences (b)(3) (b)(3) (b)(3) a. We are adopting as operational 30? the use of gust alleviator, in the flour position on cliMbout to WMEAD 5,900 and on, descent from KWMEAD 5,000. As you may knew, following the loss of #316 in BOCIDER, Headquarters recommended use of gust alleviators on climbout up to MEAD 5,000. VS assume this has been adopted as normal procedure throughout the Detachments. We did not, however, specifically recommnuituse of gust alleviators an descent from KUMEAD 5,000. This will be clarified as an operational procedure. b. All FRILITTall will be informed that abnormal oxygen pressure oxygen systommalfunotion will be absolute and positive cause for immediate abort. c. All mums will be instructed to descend to cabin MMEAD 1,000 it oxygen supply falls below normal safe pressure. d. is in process of incorporating a canopy release sea which (b)(3) will be activated by the canopy jettison handle. e. will be instructed to study the best method of Incorporating (b)(3) a warning device which will indicate to KWOLITILe that 11 has reached maximum allowable airspeed. This indicator may be some warning sicnal inside the communicatima eystem rather than an external horn which may not to heard with helmet and gear on. It may even in some type of vibrator attached to the rudder pedals which will give an indication. We propose to have WA into this (b)(3) device and discuss their approach with a-olarmts at KWCABLE. 3. The Director of Operations plans to discuss all aspects of the accident with during their IDT at Headquarters the last (b)(3) 3(/ E qtn E T 1:2 t:: -- c Approved for Release: 2017/11/27 C060355280k . .41;! Approved for Release: 2017/11/27 006035528 DISATCH LO. Page 2 of 2. of January. In this discussion your recommendatirn on initiation of month4r incident reportS will be reviewed with establishment of reporting procedure and format. You vIll be kept informed of apy agreements reacted during this discussion and before anything is 14nolized their recommendations win be forwarded to Nou for comment. Prepared: 22 Jan 57 Distribution: Copies 1 & 2 - Addressee 3 0. 0108 (1)- Contr. Off. 5 - JAG 6 - Chrone JAGibbs/hh Releasing Officer: J. A. GIBBS JACK A. GIBBS Coordinating Officer( Contr. (b)(3) (b)(3) Approved for Release: 2017/11/27 006035528