1. SOVIET USE OF IMPORTED AND DOMESTIC ROBOTS FOR CHERNOBYL' CLEANUP OPERATIONS 2. COMMENTS OF WEST GERMAN BUSINESSMAN ON CHERNOBYL CLEANUP PROCEDURES

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
06754328
Release Decision: 
RIPPUB
Original Classification: 
U
Document Page Count: 
5
Document Creation Date: 
April 23, 2025
Document Release Date: 
March 25, 2025
Sequence Number: 
Case Number: 
F-2016-02406
Publication Date: 
April 30, 1987
File: 
AttachmentSize
PDF icon 1. SOVIET USE OF IMPORTE[16471600].pdf151.68 KB
Body: 
Approved for Release: 2025/03/19 C06754328 SECRET Classified By: Unspecified Derived From: Unspecified Declassify On: MR, 20120430 410EQBN___ (S/ /NF) SUBJ: 1. SOVIET USE OF IMPORTED AND DOMESTIC ROBOTS FOR CHERNOBYL' CLEANUP OPERATIONS 2. COMMENTS OF WEST GERMAN BUSINESSMAN ON CHERNOBYL CLEANUP PROCEDURES Identifiers: Document Number Messaging System ID: 87 4653828 Ingestion ID: 31329063 GUIDE: guide://1012/3832tg Dates: Date Published: 30-Apr-1987 11:35:00 Date Received: 30-Apr-1987 11:36:00 Coverage: Region: COUNTRY: USSR, WEST GERMANY Publisher: #1 Agency Acronym: CIA Office Name: CIA #2 Agency Acronym: CIA Office Name: NCS (b)(1) (b)(3) (b)(1) (b)(3) (b)(3) Attachments:- (W(1) (b)(1) 31329063.orig ("3) (b)(3) (b)(3) (b)(1) (b)(3) (b)(1) (b)(3) (b)(1) (b)(3) Warnings: (SA NF) WARNING: INFORMATION REPORT, NOT FULLY EVALUATED INTELLIGENCE REPORT CLASS SECRET--WNINTEL--NOFORN-- DIST: 30 APRIL 1987 COUNTRY: USSR/WEST GERMANY SUBJ: 1. SOVIET USE OF IMPORTED AND DOMESTIC ROBOTS FOR CHERNOBYL' CLEANUP OPERATIONS 2. COMMENTS OF WEST GERMAN BUSINESSMAN ON CHERNOBYL CLEANUP PROCEDURES OF THE USSR PLANS TO HAVE REACTOR NUMBER 3 AT CHERNOBYL BACK IN SERVICE BY THE END 1987. (b)(1) HUNDREDS OF DECONTAMINATION WORKERS DIED IN THIS OPERATION. (b)(3) 1 EXAMPLES OF IMPROPER SAFETY PROCEDURES EMPLOYEES WITNESSED SOVIET WORKERS SABOTAGING EQUIPMENT TO KEEP FROM BEING SENT SECR 4N.0(b)(1 (b)(3) Approved for Release: 2025/03/19 C06754328 (b)(1) (b)(3) Approved for Release: 2025/03/19 C06754328, , ) SECRET/ NOFORN (b)(3) (b)(1) (b)(3) (b)(1) (b)(3) (b)(1) (b)(3) TO THE SITE. RUMORS THAT POSSIBLY 10 SOVIET SOLDIERS HAD BEEN EXECUTED FOR TRYING TO AVOID DECONTAMINATION DUTY. (S/ 'NF) SERIAL: (b)(1) PASS: NSA FOR ZKZK 00 DLS DE (FOR NSOC); STA(b)(3))R INR; DOE/DASI. CENTRAL INTELLIGENCE AGENCY WARNING: INFORMATION REPORT, NOT FULLY EVALUATED INTELLIGENCE REPORT CLASS SECRET--WNINTEL--NOFORN--- DIST: 30 APRIL 1987 COUNTRY: USSRNVEST GERMANY SUBJ: 1. SOVIET USE OF IMPORTED AND DOMESTIC ROBOTS FOR CHERNOBYL' CLEANUP OPERATIONS 2. COMMENTS OF WEST GERMAN BUSINESSMAN ON CHERNOBYL CLEANUP PROCEDURES DOI: (b)(3) SOURCE:1 SUMMARY (b)(1) (b)(3) THE USSR PLANS TO HAVE REACTOR NUMBER 3 AT CHERNOBYL BACK IN SERVICE BY THE END OF 1987. THE WORKERS INVOLVED SUFFERED ONLY LIGHT EXPOSURE TO RADIATION. ON THE OTHER HAND, � (b)(1) (b)(3) HUNDREDS OF (b)(1) DECONTAMINATION WORKERS DIED IN THIS OPERATION. EXAMPLES OF (b)(3) IMPROPER SAFETY PROCEDURES SOVIET WORKERS SABOTAGING (1 ")PMENT TO KEEP FROM BEINIn SENT TO THE SITE. b)( (b)(3)3ECRETh (NOF01(b)(1) (b)(1) (b)(3) (b)(3) 2 Approved for Release: 2025/03/19 C06754328 Approved for Release: 2025/03/19 C06754328 (b)(1) (b)(3) (b)(1) (b)(3) SECRET/I NOFORN ALSO REPORTED RUMORS THAT POSSIBLY 10 SOVIET SOLDIERS HAD BEEN EXECUTED FOR TRYING TO AVOID DECONTAMINATION DUTY. BACK INTO SERVICE DURING THE LAST TEN DAYS OF 1987. (b)(3) ALL CLEANUP OPERATIONS AT THE SITE ARE PROCEEDING ON SCHEDULE ANLJ NO DIFFICULTY IN MAINTAINING THE TIMETABLE FOR RESTARTING REACTOR 3. IN INFORMAL DISCUSSIONS OF THE ACCIDENT AND (b)(1) ITS AFTERMATH, OVER 600 WORKEF(D)(3) ENGAGED IN CLEANUP OPERATIONS AT THE SITE. CHERNOBYL UNIT NUMBER THREE WI I (1) "s") (b) PLACING UP TO SIX DOSIMETERS ON THE CLEANUP WORKERS AND STUDYING THE CORRELATED RESULTS TO DETERMINE WHICH PORTIONS OF THE SITE WERE HOTTER THAN THE REST, AND WHICH PORTIONS OF A WORKER'S BODY WERE MORE APT TO RECEIVE HIGHER RADIATION DOSES. HUNDREDS OF SOVIET CLEANUP WORKERS HAD RECEIVED FATAL DOSES OF RADIATION AT CHERNOBYL IMMEDIATELY FOLLOWING THE BEGINNING OF CLEANUP OPERATIONS. ONE EXAMPLE WAS A SENIOR SOVIET ENGINEER WHO WAS A LEADING MEMBER OF THE TECHNICAL TEAM NEGOTIATING WITH BLOCHER MOTOR FOR THE PURCHASE OF ADDITIONAL ROBOTS TO USE AT SECRET/ NOFORN (b)(1) I (b)(3) (b)(1) (b)(3) (b)(1) (b)(3) 3 (b)(1) (b)(3) (b)(1) (b)(3) (b)(1) (b)(3) (b)(1) (b)(3) Approved for Release: 2025/03/19 C06754328 Approved for Release: 2025/03/19 C06754328 SECRET in' NOFORN (b)(1) CHERNOBYL. THESE NEGOTIATIONS HAD BEEN PROCEEDING FOR SEVERAL DAYS(b)(3) IN KIEV, WHEN ONE MORNING THIS ENGINEER DID NOT APPEAR FOR THE SESSION. HIS SOVIET COLLEAGUES EXPLAINED THAT HE HAD DIED THE PREVIOUS EVENING OF BLEEDING FROM THE BRAIN CAUSED BY EXHAUSTION. IN LATER DISCUSSIONS, THIS (b)(1) ENGINEER HAD BEEN HEAVILY INVOLVED IN ON-SITE CLEANUP OPERATIONS AT (b)(3) CHERNOBYL. UP TO TEN SOVIET SOLDIERS WHO WERE BEING USED FOR DECONTAMINATION WORK HAD BEEN EXECUTED FOR TRYING TO RUN AWAY FPnItA THE SITE. (b)(1) EMPLOYEES ON SITE DID HAVE FIRST HAND KNOWLEDGE OF (b)(3) SOVIET WORKERS DELIBERATELY SABOTAGING PIECES OF EQUIPMENT SO THEY WOULD NOT HAVE TO GO BACK TO THE SITE AND BE EXPOSED TO MORE RADIATIONJ SOME SOVIET TECHNICIANS TOLD THEM THAT CERTAIN SPOTS AT THE ACCIDENT SITE WERE READING 10 TO THE EIGHTH RADS PER HOUR RIGHT AFTER THE ACCIDENT. REGARDING SOVIET SAFETY DOCTRINE DURING THE CLEANUP OPERATION, EMPLOYEES HAD SEEN THE SOVIETS USE ROBOTIC CONCRETE SPRAYERS FROM THE WEST GERMAN FIRM PUTTSMEISTER, WITH THE LEAD SHIELDING REMOVED AND DRIVERS IN THE CAB, MANEUVERING RIGHT UP AGAINST THE CONCRETE WALL OF UNIT 4. COMMENT: PUTTSMEISTER SOLD THESE UNITS WITH THE SHIELDING ON AND WITH FULL REMOTE CONTROL CAPABILITY. IT IS NOT KNOWN WHY THE SOVIETS CHOSE TO OPERATE THEM IN THIS MANNER.) 5. pOMMENT: BLOCHER MOTOR WON THE INITIAL US$40 MILLION CONTRACT FROM THE SOVIETS TO SUPPLY ADDITIONAL ROBOTS AND A REMOTE CONTROL COMMAND CENTER AFTER THE GERMAN GOVERNMENT-SUPPLIED ROBOTS (b)(1) BEGAN TO FAIL.) THE GERMAN GOVERNMENT'S NUCLEAR (b)(3) EMERGENCY BRIGADE SUPPLIED THE SOVIETS WITH THREE ROBOTS: 1 MF-2 4 '(b)(1) MF-3 AND ONE 30-TON REMOTE-CONTROLLED BULLDOZER. TI-lksw_a\ ROBOTS FAILED SHORTLY AFTER DEPLOYMENT BECAUSE POWER SUPPLY ""'") FLUCTUATIONS HAD BURNED OUT THESE UNITS' ELECTRONICS. CONTRACT WAS FOR 1 MF-3 AND 1 MF-4 ROBOT, PLUS A TRAILER-SIZED COMMAND POST CONTAINING NUMEROUS COMPUTER CONSOLES, VIDEO MONITORS, AND REMOTE CONTROL STATIONS FOR THE ROBOTS. IN ADDITION TO THE TWO ROBOTS COMMAND POST WAS BUILT TO CONTROL EIGHT ROBOTIC CRANES WITH 200-FOOT LONG BOOMS, WHICH HAD BEEN SUPPLIED TO (b)(1) THE SOVIETS BY THE WEST GERMAN FIRM LIEPER. COMMENT: (b)(3) DISSEM: WARNING: REPORT CLASS SECRET --WARNING NOTICE-INTELLIGENCE SOURCES OR METHODS INVOLVED--NOT RELEASABLE TO FOREIGN NATIONALS--NOT SECRET) (b)(1) (b)(3)40FORN 4 (b)(1) (b)(3) (b)(1) (b)(3) (b)(1) (b)(3) (b)(1) (b)(3) (b)(1) (b)(3) Approved for Release: 2025/03/19 C06754328 Approved for Release: 2025/03/19 C06754328 (b)(1) SECRET/ ' 'NOFORN (b)(3) iNLL PORTIONS CARRY CLASSIFICATION AND CONTROLS OF OVERALL DOCUMENT. END OF MESSAGE SECRET.> NNNNEND OF MESSAGE SECRET Collection: CC Creator: #1 Agency Acronym: CIA Office Name: CIA #2 Agency Acronym: CIA Office Name: NCS � Description: (S NF) None Language: eng Precedence: R Source: Source #1 Attributions: CIA Source #2 Subject: -- (b)(1) (b)(3) (b)(1) (b)(3) (b)(1) (b)(3) SECRET/A NOFORN 5 (b)(1) (b)(3) Approved for Release: 2025/03/19 C06754328