(UNTITLED)
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP61S00750A000400090098-0
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
2
Document Creation Date:
November 16, 2016
Document Release Date:
August 5, 1999
Sequence Number:
98
Case Number:
Content Type:
CABLE
File:
Attachment | Size |
---|---|
![]() | 89.4 KB |
Body:
Approved For Relea 2000 1`2.TCIA-RDP61 S0075Q4000400090098-0
25X1 A M 18ii6 (IN 09871) 29/0343Z
251X1 A TO : M INFO:
25X1A
25X1A
25X1A
25X1A
25X1A
25X1A
1. VARYING degree understanding proper method transporting Aq/Aut
take. This msg intended define opinions this regard and procedures
listed herein will be utilized unless superceded by HQs directive.
2. For missions which are processed and analyzed by HTA 3:
A. Until HTA 3 has some printers and a capability to produce dupe
positive Mark-10 will be shipped to ~ by first available aircraft following
can letion analysis. M will be expected prepare dupe positive for 25X1A
and ship original HQS by first available courier following completion g
duping. Specific couriers departing _ will be designated to continue HQS.
Other couriers will be available from
3. When HTA 3 has capability dupe procedure will become:
25X1A A. Original will be shipped direct HQS via on first
25X1A available a/c followin du in . At - shipment a consolidated
with shipments from so single courier could be utilized. 25X1A
25X1A B. Du es would be forwarded on next shipment to either
25X1A or ' If could arrange pick up there. Under
25X1A no condition sh d both original and dupe be in same shipment.
Co For missions which are to be processed either =or HTA 2 25X1A
25X1A movement to be by first available aircraft to - following completion overlay
25X1A L. For missions which are to be processed movement will be by
continuous courier via Dover fastest route avail at time following completion
overlay. Believe such missions should not be coordinated with _ due to 25X1A
nature of contents.
25X1A
25X1A
25X1A
25X1A
5. Mark-6/8 take movement to HQS will be by, HQS bound couriers. As soon
as originals received by HQS, dupes will be shipped' currently
confused this matter queries:
25X1A
25X1A
25X1A
25X1A
25X1A
Is shortstopping current shipments for purpose of duping
for and hence delaying arrival HQS? -
If so, can - stop making dupes since there is an apparent
duplication?
has no opinions one way or other on this matter but would like answer
so can establish proper procedure beyond shadow of doubt.
6. FYI present transport utilizing 322,ND a/c working
very well. Last few fits have taken less than one d epa. ure 25X1 A
until arrival- except s 1331 which was delayed 1 day in
Approved For Release 2000/04/1.2 : CIA-RDP61 SO075OA000400090098-0
SECRL,L
25X1A
25X1A
25X1A
25X1A
25X1A
Approved For Relea 2000/04/1 Z5 J DP61 S00750*000400090098-0
7. Additional queries same subject: 25X1A
A. Would HQS look favorably on soi-weekl enable some fromsol on
so permanent s ace can be obtained? This ,A d~
from Would apply only to missions analyzed by
B. Does determine which missions will be-processed and 25X1A
analyzed HTA 3. Specifically will Mark-3 Mark-l0 be handled locally, at
or at
C. Will receive dupe positive for
END OF MESSAGE.
Approved For Release 2000/04/12 P61 S0075OA000400090098-0