THE FOLLOWING MESSAGE CONSISTS OF THOSE PORTIONS OF THE OAK
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78B04558A000400120014-0
Release Decision:
RIPPUB
Original Classification:
T
Document Page Count:
9
Document Creation Date:
December 28, 2016
Sequence Number:
14
Case Number:
Content Type:
CABLE
File:
Attachment | Size |
---|---|
![]() | 321.06 KB |
Body:
Approved For Release 2008/01/07: CIA-RDP78BO4558A000400120014-0
-0
Declassification Review by NGA
T 0 P S E C R E T
1
THE FOLLOWING MESSAGE CONSISTS OF THOSE PORTIONS OF THE OAK
ON MISSION 1023-1 (DATE OF INFORMATION 18-22 AUGUST 65) WHICH ARE 3 o kUG 1965,,,-..,
RELEASABLE TO THE
~ IT SHOULD BE NOTED THAT HEAD-
QUARTERS HAS REQUESTED IT BE POUCHED TO
TRANSMITTED ELECTRICALLY.
?
RATHER THAN
SHUANG-CHENG-TZU MISSILE TEST CENTER CH 4107N 10020E
NO SIGNIFICANT CHANGES OBSERVED AT ANY OF THE COMPONENTS OF THE TE
CENTER WITH THE EXCEPTION OF THE FOLLOWING -- AT THE SAM R&D AREA
PIECES OF EQUIPMENT ARE LOCATED IN THE CENTRAL GUIDANCE AREA OF
COPS RFCEIVE25X1
Office Act.
Cy No. X. - C -
File 25X1
LAUNCH AREA At AND 1 PIECE OF EQUIPMENT IS LOCATED IN THE HOLD ARE
FIVE UNIDENTIFIED OBJECTS ARE LOCATED NEAR THE MOTOR POOL AT THE S
HOUSING AND SUPPORT AREA. TWO SMALL BUILDINGS AND AN UNIDENTIFIED
STRUCTURE ARE OBSERVED ALONG THE NORTH SIDE OF THE SSM ASSEMBLY AN
CHECKOUT AREA. FIVE BUILDINGS AND 2 POSSIBLE BUILDING FOUNDATIONS
ARE NOW LOCATED IN AN AREA OF CONSTRUCTION ACTIVITY WEST OF THE
SSM--SAM ASSEMBLY AND CHECKOUT COMPLEX. TWO POSSIBLE BUILDING
FOUNDATIONS ARE VISIBLE IN THE PREVIOUSLY REPORTED AREA OF NEW
ACTIVITY WNW OF THE POSSIBLE PROPELLANT HANDLING AND STORAGE AREA.
ACTIVITY AT SHUANG-CHENG-TZU AIRFIELD IS REPORTED UNDER COMOR
P&~ 52X1--
PAG
DIA)..:-4
SFAD
NSA !_O
D!A 6r
NO 1NEW SAM ACTIVITY NOTED IN WESTERN 85 PERCENT OF THE 50-NM-RAC
SEARCH AREA ON OR IN THE WESTERN 10 PERCENT OF THE AREA ON -25X1"T-
Waewing $ t
,_,,,25X1 eaUoo; i
Tnp cRRFT
Approved For Release 2008/01/07: CIA-RDP78BO4558A000400120014-0
OUT56562
Approved For Release 2008/01/07: CIA-RDP78B04558A000400120014-0
0
REMAINING PORTIONS OF TH- ~~EARCH AREA NOT COVERED.
S
TAI?.YUAN SOLID PROPELLANT TEST FACILITY CH 3759N 11233E
NO EVIDENCE OF MISSILE PRODUCTION OR RECENT ACTIVITY OBSERVED.
PEIPING RKT ENG TEST FAC CHANG-HSIN-TIEN CH 3950N 11608E
THREE BUILDINGS INTERCONNECTED BY PIPELINES AND SEVERAL SMALL
STRUCTURES ARE VISIBLE IN THE AREA OF CONTINUING CONSTRUCTION AT THE
NORTH END OF THE TEST FACILITY. NO OTHER SIGNIFICANT CONSTRUCTION
ACTIVITY OBSERVED.
A SMALL BLAST MARK IS VISIBLE AT A TEST BUILDING IN THE COMPONENTS
TEST AREA LOCATED IN THE NW CORNER OF THE FACILITY. STAINS IN THE
EFFLUENT SUMPS AND EARTH SCARRING IN THE BLAST PITS OF THE 3
VERTICAL TEST STANDS ARE INDICATIVE OF CONTINUING TEST ACTIVITY.
ENTIRE SEARCH AREA IS COVERED. NORTHERN THIRD IS OBSCURED BY
SCATTERED-TO-HEAVY CLOUDS. THE REMAINDER OF THE SEARCH AREA IS
COVERED BY GOOD, STEREO PHOTOGRAPHY. NO NEW SAM ACTIVITY OBSERVED
IN CLOUD-FREE AREAS.
25X1
25X1
1
25X1
25X1
PING-HSIANG COMPLEX CH 2207N 10646E 25X1
:14 - Approved For Release 2008/01/07: CIA-RDP78B04558A000400120014-0
Approved For Release 2008/01/07: CIA-RDP78B04558A000400120014-0
TRANSSHIPMENT FACILITY IS FILLED TO 50 PERCENT OF CAPACITY.
OBLIQUITY PRECLUDES FURTHER INTERPRETATION.
LEI-YANG AIRFIELD CH 2635N 11253E
NO APPARENT CHANGE IN FACILITIES SINCE
AIRCRAFT -- NONE OBSERVED.
KUANG-CHOU/FO-SHAN AIRFIELD CH 2305N 11304E
NO APPARENT CHANGE SINCE
OBSERVED.
NO RADAR FACILITIES
AIRCRAFT -- 4 SMALL SWEPT-WING, AT LEAST 36 SMALL PROBABLE
SWEPT-WING AND 1 PROBABLE CRATE.
SHUANG-CHENG-TZU AIRFIELD CH 4021N 09947E
NO RADAR OBSERVED. NO APPARENT CHANGE IN CONSTRUCTION ACTIVITY
LOCATED ALONG TAXIWAY BETWEEN AAM AREA AND THE RUNWAY.
AIRCRAFT --
25X1
25X1
25X1
25X1
25X1
25X1
I-- 1 SMALL STRAIGHT-WING. -- 13 SMALL 25X1
SWEPT-WING AND 1 SMALL STRAIGHT-WING.
WU -KUNG AIRFIELD CH 3417N 10815E 25X1
AIRCRAFT -- 1 BADGER, 13 BULL AND 2 SMALL STRAIGHT-WING.
Approved For Release 2008/01/07: CIA-RDP78B04558A000400120014-0
Approved For Release 2008/01/07: CIA-RDP78BO4558A000400120014-0
RP
HSI-A1i _ -11CRAFT ENGINE PLANT WU-KUNG CH 3417N 10815E 25X1
NO NEW CONSTRUCTION OBSERVED. PRODUCTION STATUS CANNOT BE
DETERMINED
.
AIRCRAFT ARE REPORTED UNDER COMOR
NAN-NING AIRFIELD SOUTH CH 2236N 108
15 NM SW OF NAN-NING.
7,875 X 200 FT NE/SW CONCRETE RUNWAY, SERVICEABLE. FACILITIES
INCLUDE A PARALLEL LOOP TAXIWAY WITH I CROSSOVER LINK, 2 ALERT RAMPS
(ONE AT EACH END OF THE RUNWAY), AND 2 PARKING APRONS (ONE ALONG
PARALLEL TAXIWAY AND THE OTHER IN FRONT OF AN ADMINISTRATION AREA
AND CONNECTED TO PARALLEL TAXIWAY BY 2 LINKS). TWO NEWLY IDENTIFIED
AIRCRAFT DISPERSAL AREAS LOCATED AT EITHER END OF THE AIRFIELD
CONSIST OF AT LEAST 20 HARDSTANDS. ELECTRONICS CONSIST OF AN ILS.
OTHER FACILITIES INCLUDE 1 LARGE ADMINISTRATION BUILDING, I CONTROL
TOWER, APPROXIMATELY 30 OTHER SUPPORT BUILDINGS, AND A POL STORAGE
AREA (IMMEDIATELY NW OF RUNWAY CENTER). HOUSING AREAS OBSERVED 0.1
NM NNW AND 2.5 NM WNW OF RUNWAY CENTER.
AIRCRAFT -- NONE OBSERVED.
NING-MING AIRFIELD CH 2207N 10707E
3.6 NM ESE OF NING-MING.
7,560 X 155 FT ENE/WSW CONCRETE RUNWAY, WITH 1,375-FT OVERRUNS AT
EACH END, APPEARS TO BE IN FINAL STAGE OF CONSTRUCTION.
25X1
25X1
25X1
25X1
25X1
1 Approved For Release 2008/01/07: CIA-RDP78BO4558A000400120014-0
Approved For Release 2008/01/07: CIA-RDP78B04558A000400120014-0
0
0
FACILITIES INCLUDE A PARALLEL TAXIWAY WITH 2 END-CONNECTING LINKS, 2
CROSSOVER LINKS, 2 CONCRETE ALERT APRONS, 3 PARKING APRONS, AT LEAST
20 PARKING REVETMENTS NORTH OF THE WSW AND ENE ENDS OF RUNWAY IN
VARIOUS STAGES OF CONSTRUCTION, AND ARAIL-SERVED PROBABLE POL
STORAGE AREA IN EARLY STAGE OF CONSTRUCTION 3.2 NM NNW OF THE
RUNWAY.
NO RADAR OBSERVED. AIRFIELD IS IN TERMINAL STAGE OF CONSTRUCTION.
AIRCRAFT -- 5 SMALL SWEPT-WING AND 14 SMALL PROBABLE.
TIEN-YANG AIRFIELD CH 2344N 10658E
3 NM EAST OF TIEN-YANG.
AIRFIELD IN EARLY STAGES OF CONSTRUCTION. NW/SE GRADED AREA
APPROXIMATELY 9,000 FT LONG.
FOUR HARDSTANDS OBSERVED IN EARLY STAGES OF CONSTRUCTION AT SE END
OF AIRFIELD.
AIRCRAFT -- NONE OBSERVED.
LAN-CHOU GASEOUS DIFFUSION PLANT CH 3609N 10329E
WORK ON THE THIRD SEDIMENTATION BASIN IS CONTINUING. THE FIRST TWO
BASINS ARE FILLED WITH WATER. WATER IS BEING DISCHARGED TO THE
IMPROVED OPEN EFFLUENT CHANNEL EAST OF THE STEAMPLANT. NO OTHER
SIGNIFICANT CHANGES EVIDENT.
CENTRAL AND WESTERN 70 PERCENT OF THE SAM SEARCH AREA IS COVERED ON
THE NORTHERN AND SOUTHERN PORTIONS OF THE AREA OBSERVED
Approved For Release 2008/01/07: CIA-RDP78B04558A000400120014-0
Approved For Release 2008/01/07: CIA-RDP78BO4558A000400120014-0
?
ARE COVERED BY SCATTERED CLOUDS. NO ADDITIONAL SAM ACTIVITY NOTED.
WESTERN 5 PERCENT OF THE SAM SEARCH AREA IS COVERED ON THE 25X1
PORTION OBSERVED IS COVERED BY SCATTERED CLOUDS. NO SAM ACTIVITY
NOTED .
SHANG-HSUAN HYDRO POWERPLANT YEN-KUO HSIA CH 3601N 10315E
WATER BEING DISCHARGED FROM ONE TAILRACE GATE OF POWERPLANT
INDICATES POSSIBLY I TURBOGENERATOR IS IN OPERATION. FULL HEAD OF
WATER FLOWING THROUGH 5 OF 6 SPILLWAY GATES.
THE CENTRAL AND WESTERN 80 PERCENT OF THE SAM SEARCH AREA IS COVERED
ON THE NORTHERN AND SOUTHERN PORTIONS OF THE AREA
OBSERVED ARE COVERED BY SCATTERED CLOUDS. NO ADDITIONAL SAM
THE PORTION OBSERVED IS COVERED BY SCATTERED CLOUDS. NO SAM
ACTIVITY NOTED.
ACTIVITY NOTED.
THE WESTERN 10 PERCENT OF THE SAM SEARCH AREA IS COVERED ON
SSE THIRD OF 50-NM SAM SEARCH AREA COVERED BY CLEAR PHOTOGRAPHY. NO
PAO?-TOU ATOMIC ENERGY COMPLEX CH 4039N 10957E
PRODUCTION FACILITY NOT COVERED.
Approved For Release 2008/01/07: CIA-RDP78BO4558A000400120014-0
Approved For Release 2008/01/07: CIA-RDP78BO4558A000400120014-0
Iq
Next 2 Page(s) In Document Denied
Approved For Release 2008/01/07: CIA-RDP78BO4558A000400120014-0
/a
1
1
HUANG-PU NAVAL BASE AND SHIPYARD CH 2305N 11325E
FACILITIES INCLUDE 1 GRAVING DOCK AND 1 ABANDONED GRAVING DOCK, 2
SETS OF MARINE RAILWAYS WITH ADJOINING BUILDING/REPAIR RAMPS,
NUMEROUS QUAYED AREAS, 7 PIERS, 4 LARGE MONITOR-ROOFED BUILDINGS,
NUMEROUS WAREHOUSE, STORAGE AND SHOP-TYPE BUILDINGS, AND A SMALL
PROBABLE STEEL PLANT.
VESSELS -- BOTH BUILDING WAYS/REPAIR WAYS AND GRAVING DOCK ARE
OCCUPIED BY UNIDENTIFIED VESSELS. ONE POSSIBLE LST, 2 AUXILIARY,
AND NUMEROUS SMALLER VESSELS ARE MOORED ALONG THE RIVER.
LU-CHOU EXPLOSIVES PLANT 23D ARSENAL CH 2853N 10531E
CHEMICAL ARSENAL COVERING APPROXIMATELY 1 SQ MI IN AREA IS NOT RAIL
SERVED. EXPLOSIVES STORAGE AREA IS WITHIN THE EAST END OF PLANT.
THREE SEPARATE STORAGE AREAS ARE 1 NM, 2 NM, AND 2.3 NM EAST OF
PLANT. SCALE AND QUALITY PRECLUDE DETERMINATION OF ROOF DETAIL IN
Approved For Release 2008/01/07: CIA-RDP78BO4558A000400120014-0
0 ?
Approved For Release 2008/01/07: CIA-RDP78BO4558A000400120014-0
Approved For Release 2008/01/07: CIA-RDP78BO4558A000400120014-0
?
STO~a TREAS. NO EVIDENCE OF CW STORAGEOBSERVED.
?
SHUANG-CHENG-TZU MTR POSS DN RGE INSTR PT CH 4041N 09835E
NO INSTRUMENTATION SITE, EQUIPMENT-OR MISSILE ACTIVITY OBSERVED
WITHIN THE SEARCH AREAS.
HENG-YANG AMMUNITION DEPOT ENE FEN-SHUI-AO CH 2656N 11243E
6 NIl ENE OF HENG-YANG.
RAIL-SERVED, SECURED DEPOT CONTAINS 14 DISPERSED STORAGE BUILDINGS,
AT LEAST 35 UNDERGROUND STORAGE BUNKERS, AND RAIL-TO-ROAD TRANSFER
POINT WITH I LARGE TRANSSHIPMENT SHED AND APPROXIMATELY 30
ADMINISTRATION/ SUPPORT BUILDINGS. NO EVIDENCE OF MATERIALS
STOCKPILING OR OTHER UNUSUAL ACTIVITY.
MIAO-TANG SPECIAL AREA CH 2835N 10700E
NO EVIDENCE OF MILITARY ACTIVITY IN WESTERN 30 PERCENT OF THE SEARCH
AREA. REMAINDER OF SEARCH AREA NOT COVERED.
T O P S E C R E T
/END OF MESSAGE/
25X1
25X1
25X1
25X1
25X1
25X1
Approved For Release 2008/01/07: CIA-RDP78BO4558A000400120014-0