DEAR SIR:
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78B04747A001900020004-6
Release Decision:
RIPPUB
Original Classification:
K
Document Page Count:
3
Document Creation Date:
December 28, 2016
Document Release Date:
October 16, 2001
Sequence Number:
4
Case Number:
Publication Date:
September 3, 1965
Content Type:
LETTER
File:
Attachment | Size |
---|---|
![]() | 220.24 KB |
Body:
! STATINTL
`
.
STATINTL Dear Sir: STATINTL
STATTINTL F
resen tat~ves of your A
ency
wgw At
ss nom'- w th re
disc
rom
p
g
,
u
have come to believe that the experience of per, p91 at the
e, n orma on Processing Division NPIC
M.i
could be pro -
and facilities in
STATING ATINTL
'DIHLIIN:IL
detail
e
b
n
f
h
i
as a..
as
ee
c--taaaaasa
Phase J. aaaas
WIC WVLn o
is proposal in W
c
ST rjINTL the first step in a two year program leading to the construction, installation,
Director, NPIC
Washington, DECLASS REVIEW by N I M
D. C. STATINTL
cost breakdown submitted at,that time, along with budgetary estimates for the .
are provided only for Phase I; the other Phase being covered''Oy general task
descriptions.. Phase II will be defined in detail during Phase I and a detailed
Annual Report, a brochure on the and a re evant STATINTL
technical memorandum.
STATINTL
Of the four phases of work proposed a detailed work statement and costs
witted with. the proposal is.a detailed cost breakdown, a 1964
Center with the,objgctive.of designing and putting into operation an improved
system. The terms of-our offer are explained in the attached; ro osal. Sub-
in analyzing current processing operations at the National Photo Interpretation
ably applied to the improvement of photointel- igence proceaS pg operations.
die are, therefore, pleased to propose to work cooperatively'?WIth Agency personnel
and operational support of an improved NPIC data processing system.
assures the NPIC that we will, if desired, complete the rema n er of
this program in the proposed time scale and will continue to support the NPIC
in training, programming, and maintenance activities as required.
;,~.1 4. It is estimated that Phase I can be performed using a total of 26 man-months
ans
our or
t at a
to
t
of a
h
g
par
cost.
y
h a Mate
UL labor wit
in &J. VU J mton WILD from
zation of This estimate has 'been developed
on the basis that any resulting contract would be a cost-plus-fixed-fee type.
The accomplishment of Phase I goals at this level of effort is only possible be-
--
,
---
I L ----- "---- ---------as.----
STMTINTL progress at t `a ,significant rate, The specific pro ;i cts under which this
Approved- For Release 2001/11/07.:
STATINTL
September 3r 1965
STATINTL STATINTL
Above and beyond the direct labor and the support from parallel pro-
erformed at NPIC facilities in Washington, D.C.,.with the remainder at
From ten (10) to fifteen (15) man months of the Phase I work will be,
STATINTL
again at no direct charge. i
by management and members of the Special,,'Projects Department
role in the Phase I work. Further significant contributions will be made
proposal. The only'char a to our or anization for this activity will be
for the services of who will play a direct and major
grams, contributions will be made by' an advisory panel described in the
lating the most appropriate security plan.
STATINTL
The program will be organized and conducted in a manner that will
insure positive security control over all aspects of the work. We will
welcome the assistance and guidance of your security personnel in formu-
STATINTL
Working space will be provided at tor an
Project Engineer and other representatives as required. STATINTL
can begin work on the program immediately. Ther is no
additional material or 'equipment.
requirement to hire additional personnel nor to purchase or have furn"fished
This offer is valid for 90 days.
in connection with this proposal
STATINTL
can be rear
ad to assist you
STATINTL.
'very truly yours,
STATINTL
STATINTL Approved For Release 2001/11/07 : CIA-RDP78BO4747AO01900020004-6
Approved For Release 2001/11/07 : CIA-RDP78BO4747AO01900020004-6