(Sanitized) - IIS - PROJECT STATUS REPORT
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78B04747A001900040011-6
Release Decision:
RIPPUB
Original Classification:
T
Document Page Count:
11
Document Creation Date:
December 28, 2016
Document Release Date:
December 11, 2001
Sequence Number:
11
Case Number:
Publication Date:
August 9, 1967
Content Type:
MF
File:
Attachment | Size |
---|---|
![]() | 994.46 KB |
Body:
Approved
NPIC/A/TD
(Attn:
'OR SWSf TR -- i
For Rel 002 DP78B047T ]J 0190004011-6
WS-182}4/(a7 Copy
25X1A
CONTROL NO.
Handle Via Indicated Controls
TALENT-KEYHOLE
DECLASS REVIEW by NIMA/DOD
WARNING
This document contains information affecting the national security of the United States within the meaning
of the espionage laws U. S. Code Title 18, Sections 793 and 794. The la wpr iieitssitse an missiannor
the revelation of its contents in any manner to an unauthorized person, m Prejudicial to the safety or interest of the United States or for the benefit lo fy any foreigntgovern a tt toi the
detriment of the United States. It is to be seen only by personnel P
to receive Information in the designated control channels. Its security must be maintained in accordance
with regulations pertaining to TALENT=KEYHOLE Control System.
GROUP i or
ElTT rvl
'i.?
Approved For ReleaseTjPO1/S H78BO4747AO0190004001 E ?.cl~?dI.?md.e?'.urm /
HANDLE VIA ' IlC M
1/
Zig N
TALENT-KFYHOLo L~Approved For Ma
COI~LTRd~ S,ygTF -
TCS-1821+6/67
9 August 1967
Copy _j
MEMORANDUM FOR: See Distribution
25X1 A SUBJECT : 0- IIS - Project Status Report
1. The attached report reflects the status of the - IIS project
a/o the date indicated in the report heading. A cursor line equating
to the a/o date is simulated by a row of periods (.) appearing on each
task line under the appropriate week of the calendar reference reflected
in the columnar heading line.
2. Estimated start and Completion Dates are shown for each task
expressed in.ymmdd (year-month-day) format. A graphic portrayal of each
task is also displayed appropriately scaled with an "S" for start and an
"E" for estimated completion date, connected by a row of record marks
to bracket the duration of the project item.
3. As Actual Completion dates occur, they will be appropriately
recorded and appear under the report column titled "ACTUAL," and the
graphic portrayal will reflect an "A," position-scaled to agree with
the actual completion date. (Also, a "C" will appear at the extreme
right under the column heading "FLAG," to indicate project item com-
pletion.)
4. If a project completion date is not recorded within the time
frame estimated (i.e.,the a/o date of report is greater than the
estimated completion date of project item), a late indicator "L" will
appear under the "FLAG" column of the report.
5. As a convenience for project monitors, items which will become
due during the current week of the report are flagged with an asterisk
(*) under the "FLAG" column of the report. This is to invite attention
to project items still in work--not yet late--but which should be checked
to ensure on-time completion.
6. The FLAG column is also used to key appropriate comments
appearing at the end of the report to specific project items flagged
above.
7. At the end of the report, two summary lines recap the over-
all project status. It should be noted that "Completed M-Months" of
. GROUP i
Excluded from automatic
downgrading and
declasslficatlon
HANDLE VIA
TALENT-KEYHOLE
i ONLY;
Approved For lge app q 2 04747AOOAL~~3?194 Pik
25X1A
Approved For Release 200 1/ S -FWPT
B04747A001900040011-6
HANDLE VlA~
TOP
TALENT-KEYHOLE
CONTROL. sYSTEM ONLY .
Tcs-18246/67
effort will reflect only time for project items which have actually been
completed. No attempt is made :to accumulate completed man-months on an
accrual basis during the period of project fulfillment. Conversely,
however, the month's completed field (on the second summary line) repre-
sents time elapsed (in months and tenths) from over-all project start
date to the a/o date of the report.
R_ Additional information concerning this report may be obtained
25X1 A from
Chief, Information Processing Division
NPIC
Attachment: a/s
Distribution:
Cy 1 - NPIC/O/Dir (w/att)
25X1A 2 - OPPB/IPS (Attn: (w/att)
3 - NPIC/A/P&M (w/att
4 - NPIC/A/Ops (w/att)
25X1A 5 - NPIC/A/TD (Attn: (w/att) -
6-8 - NPIC/IPD (w/atts)
HANDLE VIA
TALENT-KEYHOLE
Approved For Release 2002/01 29 : CIA-RDP78B04747A00d8Q Q?0Ib . M ONLY
25X1A
I 'P
TOP
CT CAE OFF
Approved For Release 2002/01/29 : CIA-RDP78BO4747AO01900040011-6
HANDLE VIA
TALENT-KEYHOLE
CONTROL SYSTEM ONLY
?* TOP SECRET - CHESS RUFF **
NPIC INTEGRATED INFORMATION SYSTEM
DATE.
PA
PROJECTADESCRI.PTI.ON
0000 PHASE-II OF ITS - DETAILED SYSTEMS
G.N STUDY. Ca?. .SI ST ING OF. S,UE TASKS BELOW
21_110100A ATTITUDE AND POSITION INVESTIGATIONS.
100- .. NP.IC-REV.1 EW./-E-VALUAT CYCLE
OOE ESTABLISHMENT OF WORKSHEET FORMAT
?2.00 . NPIC REVIE../EVAL.UATIONIAPPROVAL CYCL
0C ESTABLISHMENT OF PRODUCT SET
I P'IC._.REVI.EWLEVALUA.TIONIAPPRO1/.AL CYCLE
START E.STMT .ACT.UAL,..D.*.J