(Sanitized) - IIS - PROJECT STATUS REPORT

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78B04747A001900040011-6
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
11
Document Creation Date: 
December 28, 2016
Document Release Date: 
December 11, 2001
Sequence Number: 
11
Case Number: 
Publication Date: 
August 9, 1967
Content Type: 
MF
File: 
AttachmentSize
PDF icon CIA-RDP78B04747A001900040011-6.pdf994.46 KB
Body: 
Approved NPIC/A/TD (Attn: 'OR SWSf TR -- i For Rel 002 DP78B047T ]J 0190004011-6 WS-182}4/(a7 Copy 25X1A CONTROL NO. Handle Via Indicated Controls TALENT-KEYHOLE DECLASS REVIEW by NIMA/DOD WARNING This document contains information affecting the national security of the United States within the meaning of the espionage laws U. S. Code Title 18, Sections 793 and 794. The la wpr iieitssitse an missiannor the revelation of its contents in any manner to an unauthorized person, m Prejudicial to the safety or interest of the United States or for the benefit lo fy any foreigntgovern a tt toi the detriment of the United States. It is to be seen only by personnel P to receive Information in the designated control channels. Its security must be maintained in accordance with regulations pertaining to TALENT=KEYHOLE Control System. GROUP i or ElTT rvl 'i.? Approved For ReleaseTjPO1/S H78BO4747AO0190004001 E ?.cl~?dI.?md.e?'.urm / HANDLE VIA ' IlC M 1/ Zig N TALENT-KFYHOLo L~Approved For Ma COI~LTRd~ S,ygTF - TCS-1821+6/67 9 August 1967 Copy _j MEMORANDUM FOR: See Distribution 25X1 A SUBJECT : 0- IIS - Project Status Report 1. The attached report reflects the status of the - IIS project a/o the date indicated in the report heading. A cursor line equating to the a/o date is simulated by a row of periods (.) appearing on each task line under the appropriate week of the calendar reference reflected in the columnar heading line. 2. Estimated start and Completion Dates are shown for each task expressed in.ymmdd (year-month-day) format. A graphic portrayal of each task is also displayed appropriately scaled with an "S" for start and an "E" for estimated completion date, connected by a row of record marks to bracket the duration of the project item. 3. As Actual Completion dates occur, they will be appropriately recorded and appear under the report column titled "ACTUAL," and the graphic portrayal will reflect an "A," position-scaled to agree with the actual completion date. (Also, a "C" will appear at the extreme right under the column heading "FLAG," to indicate project item com- pletion.) 4. If a project completion date is not recorded within the time frame estimated (i.e.,the a/o date of report is greater than the estimated completion date of project item), a late indicator "L" will appear under the "FLAG" column of the report. 5. As a convenience for project monitors, items which will become due during the current week of the report are flagged with an asterisk (*) under the "FLAG" column of the report. This is to invite attention to project items still in work--not yet late--but which should be checked to ensure on-time completion. 6. The FLAG column is also used to key appropriate comments appearing at the end of the report to specific project items flagged above. 7. At the end of the report, two summary lines recap the over- all project status. It should be noted that "Completed M-Months" of . GROUP i Excluded from automatic downgrading and declasslficatlon HANDLE VIA TALENT-KEYHOLE i ONLY; Approved For lge app q 2 04747AOOAL~~3?194 Pik 25X1A Approved For Release 200 1/ S -FWPT B04747A001900040011-6 HANDLE VlA~ TOP TALENT-KEYHOLE CONTROL. sYSTEM ONLY . Tcs-18246/67 effort will reflect only time for project items which have actually been completed. No attempt is made :to accumulate completed man-months on an accrual basis during the period of project fulfillment. Conversely, however, the month's completed field (on the second summary line) repre- sents time elapsed (in months and tenths) from over-all project start date to the a/o date of the report. R_ Additional information concerning this report may be obtained 25X1 A from Chief, Information Processing Division NPIC Attachment: a/s Distribution: Cy 1 - NPIC/O/Dir (w/att) 25X1A 2 - OPPB/IPS (Attn: (w/att) 3 - NPIC/A/P&M (w/att 4 - NPIC/A/Ops (w/att) 25X1A 5 - NPIC/A/TD (Attn: (w/att) - 6-8 - NPIC/IPD (w/atts) HANDLE VIA TALENT-KEYHOLE Approved For Release 2002/01 29 : CIA-RDP78B04747A00d8Q Q?0Ib . M ONLY 25X1A I 'P TOP CT CAE OFF Approved For Release 2002/01/29 : CIA-RDP78BO4747AO01900040011-6 HANDLE VIA TALENT-KEYHOLE CONTROL SYSTEM ONLY ?* TOP SECRET - CHESS RUFF ** NPIC INTEGRATED INFORMATION SYSTEM DATE. PA PROJECTADESCRI.PTI.ON 0000 PHASE-II OF ITS - DETAILED SYSTEMS G.N STUDY. Ca?. .SI ST ING OF. S,UE TASKS BELOW 21_110100A ATTITUDE AND POSITION INVESTIGATIONS. 100- .. NP.IC-REV.1 EW./-E-VALUAT CYCLE OOE ESTABLISHMENT OF WORKSHEET FORMAT ?2.00 . NPIC REVIE../EVAL.UATIONIAPPROVAL CYCL 0C ESTABLISHMENT OF PRODUCT SET I P'IC._.REVI.EWLEVALUA.TIONIAPPRO1/.AL CYCLE START E.STMT .ACT.UAL,..D.*.J