NORTH KOREA RAILROADS

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78T05439A000300210083-8
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
6
Document Creation Date: 
December 28, 2016
Document Release Date: 
August 8, 2000
Sequence Number: 
83
Case Number: 
Publication Date: 
February 27, 1964
Content Type: 
MEMO
File: 
AttachmentSize
PDF icon CIA-RDP78T05439A000300210083-8.pdf508.93 KB
Body: 
ILLEGIB Approved For Release 2001/03/03 : CIA-RDP78TO5439A000300210083-8 Approved For Release 2001/03/03 : CIA-RDP78TO5439A000300210083-8 NO FOREIGN- DI SSE IB - ,102/64 -=27 Februa.r-y =1964 Copy / MEMORANDUM FOR: Chief, Manufacturing and Services Division, ORR r 25X1 A ATTENTION MS/TR THROUGH Chief, Requirements Branch Reconnaissance Group, CGS FROM Chief, CIA/PID (NPIC) SUBJECT North Korea Railroads REFERENCES (1) ORR Requirement No. 376/62 (Revised) (2) CIA/PID Project No. C 206/63 1. This memorandum is in response to the referenced requirement requesting a rail and traffic analysis of Rail Line 5 which extends from Chongju (39 41N .T 125 13E) to Supung-dong (40 26N - 124 57E). The location of Rail Line 5 is shown on the accompanying map titled Index to Strip Maps whereas the detailed features of the rail line (abandoned segments, new construction, spur lines,. and accurate plotting of the rail line) are shown on the two strip maps. 2. An analysis of Rail Line 5 reveals that alignment, gage, and number of tracks is correctly annotated on the map (CIA/RR/ER 62-63, Transportation in North Korea: Achievements and Prospects 1950-1961 and 1967 Plan . There are three rail spurs that appear abandoned, however. (1) A spur line extending from the main line north of Namsi to Namsi Airfield appears to have been abandoned Strip map i7. (2) A spur line east and arallel to the main line at Kusong has been abandoned zs-trip Map (3) Where Rail Line 5 crosses the Yalu River north of Sup'ung-dong, the western-most bridge has been abandoned and all traffic is*confined to the eastern bridge `trip Map 27. There is no evidence of new construction or electrification along Rail Line 5. 3. The traffic analysis on Line 5 revealed that only one southbound steam train was operating on the line. No additional details on this train were available. DECLASSIFICATION REVIEW BY NIMA / DoD Llzn S 115 f.rl~ F ~. O Rjk.FJ i N U1 SEM 4. (a) Photographic Coverage used in this Study: 25X1 C (b) Map References: WAC 290 (ONC F-9) WAC 380 (ONC 6-10) USATC S038o-2HL USTAC 0290-22AL 5. The photo analyst assigned to this project was who may be contacted on extension 2546 should any questions arise concerning this memorandum. This requirement is considered complete. 41 ENCLOSURES : 3 Annotated Maps (CIA/PID/IB-P-402/64 thru P-404/64) 25X1A 25X1A SECRET/NOr ORN r rllmC KOREA ADIZ Index to Strip Maps ,., i r .mac CIA/PID/IB-P-402/62+ ;aye