TO DETERMINE THE SCOPE, LENGTH, AND RESPONSIBILITY FOR DRAFTING OF A PROGRESS REPORT ON NSC 50 AND NSCID'S 1-15.

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP79B00970A000100050003-5
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
4
Document Creation Date: 
November 9, 2016
Document Release Date: 
July 24, 1998
Sequence Number: 
3
Case Number: 
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP79B00970A000100050003-5.pdf271.45 KB
Body: 
Approved For Release 1999/P/02" SECURITY INFOR 7VC'7, to a &791300970A000100 p0g5 To doter-nine the scope, length,, and responsibility for drafting of a Progress Report on 65C t) and NSCIIr's 1-15. 1. The last previous report on NNSC SO was submitted by XI on 23 April 1952, coverin the calendar year 1951. .chile there has been no specific requirartent expressed by N SG for a similar report on calendar 1.952, it is reasonable to assume that one would be desired. 2. The previous report dealt specifically, with 50 by nom. It did not mention the , ID' a by nee, but did deal broadly with cutters fallizig under t* c n. It was approximately a spaced pages in length and covered the fcllowinZ eneral cate;ories of eventes (1) organizational changes (carrying out of NBC 50, estinatos prodrara, formation of the E IC, etc.); (2) specific CIA programs pursuant to Aye direction (t, 26/5, 36/1, 66/1, and 10/5), (3) unsolved problems (the relationship between intelli ence and planni ,, security, etc. )3 (b) progress on covert intell.ik encce collection and its relations p to other operations; ( ) a con- cluding general statea_ nt on the capabilities of the in community to answer the ultimate questions for which it was re-- spible. 3. The responsibility for this report was scattered. first draft was done by Mr. , as . .ilCI, the basis 25X1 Aga of lengthy contributions by all offices. This was re-written and shortened by '.-Mr. , and final still further drastically 25X1 A9a shortened by I himself with Mrs. assistance. 25X1 A9a 4. Since this report, !-.1 has submitted to a coordinated IAC report an the progress of all int tligence pro riu , for 135, and has also submitted individual progress reports on ?ABC 66/1, 86/1, and 123 (adopted in 162). (State has responsibility under *3C 2A/5, while 10/ waa covered by a li ited-distribution contribution to the NBC 135 operation.) The NBC secretariat has indicated that it will request a general semi-annual updating of NBC 135, covering the period July- ecember 1952. In the normal Approved For Release 1999/09 11. I-B00=970A000100050003-5 Approved For AkIe 1999/14DSEC P79B0097g4000100050003-5 course, there should also be Progress resorts on the individual CIA projects for N SC, spaced accordin to need; none is now pressing from this standpoint, either Leeauee recently submitted (86/i and 123) or because still in es by yo (66/1). 5. Y or efficient hand determAnaation of lens th and to last year's, ;here would tions, and the paper could offices for co:= ent and addi there should be above all ope. If the report is to 1 need of lengthy office contribu- d and then sent around to on. I attach a list of possible topics for such a report. It, on the other hand, i v Is felt the a longer report is wanted -- along the lines desired by 'i?. last year -- then a n ,re elaborate procedure will be necessary. should also be ascertained whether the report will stick to d leave the rest of the intelligence cos unity to be covered by the USC 135 report. 6. Once these are determined, responsibility should b 25X1A9a in a single individual or pair of individual in judgm.rt. 25X1A9a The obvious candidates are the :?eber- teesa