1. RAILROAD BRIDGE IN PLOVDIV 2. ROAD PLANNING ADMINISTRATION

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80-00810A004500400002-9
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
2
Document Creation Date: 
December 20, 2016
Document Release Date: 
June 5, 2007
Sequence Number: 
2
Case Number: 
Publication Date: 
July 19, 1954
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP80-00810A004500400002-9.pdf81.1 KB
Body: 
Approved For Release 2007/06/05: CIA-RDP80-0081OA004500400002-9 CENTRAL INTELLIGENCE AGENCY INFORMATION REPORT SEC~tET/Cl,' 2%m Document contains information aidectink the lra- tionai Defense of the United States, within the mean- in` of Title IE. Sections 703 and 754. of the U.S. Oode. as amended. Its tranatninion or revelation of its contents to or receipt by an unauthorised person is prohibited by law. The reproduction of this form is prohibited. t1h,mOWICIALS ONLY COUNTRY Bulgaria SUBJECT le Railroad Bridge in Plovdiv 2. Road Planning Administration DATE OF INFO. PLACE ACQWRED REPORTI I DATE DISTR. 19 July 1954 NO. OF PAGES 21 REQUIREMENT NO. REFERENCES RD THE SOURCE EVALUATIONS IN THIS REPORT ARE DEFINITIVE. THE APPRAISAL OF CONTENT IS TENTATIVE. (FOR KEY SEE REVERSE) Railroad Bridge in Plovdiv 1. The railroad bridge over the Maritsa River in Plovdiv is of metal"construction, about 100 meters long, eds meters wide, set on 5-6 concrete piles, with a distance of about 3.0 meters betWeon ' the pylons. It bears a single track line and has ser- vice paths along the sides. Road Planning Adm1n1 tration 2. The'"Putproekt Orgaflizatsiya" (Road Planning Organization) is responsible for the Bulgarian road netkork and for planning road construction. It is subordinate to the General Road Administration, which is at the ministerial level. The headquarters are located-at No. 18 Rasarik Street in Sofia. The director of the organization is Radev (fnu), an engineer. 3.? In 1952-1953, the organization was carrying out repair work on various arteries, as follows: a. Sofia-Burgas road, for a distance of approximately 400 kilometers: Widening the road:Tay from s even to eight meters, leveling the cobblestone and gravel surfaces of the roads with a 16-ton compressor roller; be Sofia-Varna road: Improving the condition of the surface; c. Sofia-Plovdiv road: Improving the condition of the surface; and d. Sofia-Ruse roads Improving the condition of the surface; this road is 6-7 meters wide. 4? None of these roads are paved with cobblestones for their entire length. In some places the roads have a natural surface which has been hardened by rolling with a 16-ton roller. S80RET/ CONTROL - U.S. oynnuiS ONLY INst.? W..ld.,.t.1t t-.11...0.4 av ..y..? .t.11 M.4-1k.46. SO ..A,.. ,.Approved For Release 2007/06/05: CIA-RDP80-0081OA004500400002-9 Approved For Release 2007/06/05: CIA-RDP80-0081OA004500400002-9 Approved For Release 2007/06/05: CIA-RDP80-0081OA004500400002-9