EAST GERMAN AIRCRAFT INDUSTRY: PRODUCTION OF IL-14 P AND PLANNED SERIES PRODUCTION OF 152 B AIRCRAFT

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80T00246A045200570001-7
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
3
Document Creation Date: 
December 22, 2016
Document Release Date: 
June 22, 2010
Sequence Number: 
1
Case Number: 
Publication Date: 
November 5, 1958
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP80T00246A045200570001-7.pdf121.3 KB
Body: 
Sanitized Copy Approved for Release 2010/06/22 : CIA-RDP80T00246A045200570001-7 .---- 1 - INFORMATION REPORT INFORMATION REPORT CENTRAL INTELLIGENCE AGENCY This material contains information affecting the National Defense of the United States within the meaning 18, U.S.C. Secs. 793 and 794, the transmission or revelation of which in any manner to an unauthorized C-O-N-F-I-D-E-N-T-I-A-L NOFORN COUNTRY East Germany SUBJECT East German Aircraft Industry: Production DATE DISTR. of IL-14 P and P1anneli Series Production of 152 B Aircraf-' ?-`_? . , , NO. PAGES REFERENCES DATE OF INFO. PLACE & DATE ACQ of the Espionage Laws, Title person is prohibited by law. $ Noy jqj, 25X1 25X1 production of IL-14 P and pl ed series producton of 152 B aircraft in East Germany. 1. Series production of the IL 14 P at Dres ciovernmenti l bal.onmasenine ), Poland, and two to Bulgaria. IIn addition to East German customers (Lufthansa, NVA,. East German 2. Problems discovered in tests of the 11 14 P. 141 64111 VO 1Vi 16i1i 1~6.i bl VVi V..+11-! WlV VV v\. Hl(NiLMlc.Y wr V.aiV~ an. Factory (Flugzeugwerke Dresden). hull with a dummy pro ~t. 5. Type 152 B aircraft. The?V 1 (prototype)Awas completed on 1 May 1958 A The plane was to have been flight-tested the beginning of August; the first flight was scheduled for late September or early October Series production is to be underway no later than 1960. r Communist a have already been received for these planes. 25X1 a surplus of personnel is anticipated; in order to maintain employment, refer 4. Surplus of personnel. With the end of the IL 14 P production program in 1959, will commence. A total of 90 type IL 14 P machines are to be built; by end of 1958, 58 or 59 are to be completed. accomplished by the end of 1959. At that time, series production of the 1 3. Completion of the IL 14 P production program. It is planned that this will 6. Sabotage of the 152 B prototype during the-7h Party Congress. (It is out that this may be regarded as a true account pointed C-O-N-F-I-D-E-N-T-I-k-L NOFORN I iSTATE (Nob: ARMY, AVV IR X al Washington distribution indieoNd by "X?, Fioid distribution by AEC L] 6~%25X`1 Sanitized Copy Approved for Release 2010/06/22 : CIA-RDP80T00246A045200570001-7 Sanitized Copy Approved for Release 2010/06/22 : CIA-RDP80T00246A045200570001-7 C-O-N-F-I-D-E-N-T-I-A-L NCFORN -2 7. Miscellaneous items on construction at the Dresden aircraft factory. The lengthening of the runways has been completed. 8. Costs of IL 11i aircraft. costs for the first few mac nes have since gone down. 9. amounted to 2 million DME per machine . The Supplies and materials. The VEB Edelstahlwerk "8 Mai", Freital, is furnishing steel to the Flugzeugwerke Dresden. The VEB Elektro-Chemisches Kombinat Bitterfeld (EKB) is supplying aluminum and aluminum alloy profile and sheet. Since the East German instrument industry is not in a position to supply necessary instruments to the Flugzeugwerke, most of the instruments installed in the air- craft are of Soviet origin. VEB Junkalor Dresden has supplied the Flugzeugwerke with recording altimeters (Hoehenschreiber) for a long time. The engines for the IL 14 P (ASH 82 T) have been produced at the VEB Industriewerk Karl-Marx-Stadt since 1957. The 0 14 engine for the 152 B plane was developed at VEB Forschungs- and Eatwieklungsbau Pirna-Sonnenstein. The V series was also produced there. This engine was to be tested in the near future in an IL 28 aircraft. This plane is kept at the VEB Maschinen- and Apparatebau Schkeuditz for testing engines. C-O-N-F-I-D-E-N-T-I-A-L NCIFORN Sanitized Copy Approved for Release 2010/06/22 : CIA-RDP80T00246A045200570001-7 Sanitized Copy Approved for Release 2010/06/22 : CIA-RDP80T00246AO45200570001-7 Next 4 Page(s) In Document Denied Sanitized Copy Approved for Release 2010/06/22 : CIA-RDP80T00246AO45200570001-7