MARITIME ASSET
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP83-00036R001100120011-4
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
2
Document Creation Date:
November 17, 2016
Document Release Date:
August 17, 2000
Sequence Number:
11
Case Number:
Content Type:
REPORT
File:
Attachment | Size |
---|---|
CIA-RDP83-00036R001100120011-4.pdf | 126.69 KB |
Body:
Approved For Release 2000/9$EQIA-RDP83-000368001100120011-4
25X1A
to recruit a minimum crew for the ship (7 to 9 persons). in ~s .tion
adequate radar a navigation, equipment should be installed and two
intermediary craft acquired. Detailed cost estimates are as fo lows a
tlon equi nt - standard amase, depth meter and
sonar scope*
Equip tent Coat:
A. Radar Installation on mothership
Note a (1) Radar list price is Approx. $3500.
Total cost of installation on Matusa Time vas
Xoo. The extra cost Included fabricating a
25X1A
Fresh -ter city - 650 gallons,
P4 V 6e - 2,
Cruising
Yuel Capacity - 3,000 gallons Of
Communication equipment . at adar4 signa3. Corp transmitter
and receiver vistated capabUity of
450 watt voice eigu., 500 watt key
si .
engines and huU afar to be in excellent condition.
It is visualized that the craft mar be uee I for several
purposes - to serve as a mother ship for in>exfiltrati on
by fast, small erait, for the movement of supplies, and
material to training or operational bases, and for the
movamt of personnel frc vaz?ous places in the Caribbean
to assembly points. , interior carpentry vorl is presently
Wing on mainly instating banks for such movement o personnel.
It is estimated that fora three or four day trip the craft
could move 40 to 60 persons.
:=ended that fug be provided to enable the organization
Approved For Release 2000/1"Ilm
IA-RDP83-00036 R001100120011-4
Approved For Release 2000/09/01- - -,CFA--RDP83-00036ROO1100120011-4
Id the 60 lb..
on a
a Beach ahipyard with a priority order
mid March '6o to mid XV '60 2 months.
the subjew
for sending the
L;pnent and a tecbalci to n
P. R. both of vb;Leh may be necessary.
B. ..t inet .ation on mot erahip a
For lminchi and recovering at 1e+
600 ib. weight intae
w A from sea.
C. 2 intermediary
D. 4 B'?3 maritime beaco
1. DotaUs of carpentry on the deck of the
mot ers p curx
#14p400
wat
1,70 0
Approved For Release 2000/09/01 : C-R0P83-00036 R001100120011-4