LEGEND FOR MAP OF ODRAPORT, SWINOUJSCIE
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP83-00423R001900930005-4
Release Decision:
RIPPUB
Original Classification:
C
Document Page Count:
5
Document Creation Date:
December 14, 2016
Document Release Date:
December 29, 2000
Sequence Number:
5
Case Number:
Publication Date:
June 1, 1954
Content Type:
MAP
File:
Attachment | Size |
---|---|
CIA-RDP83-00423R001900930005-4.pdf | 218.76 KB |
Body:
Approved For Release 2001/03/ 0423 R001900930005-4
Legend for Map of Odraport, Swinoujscie
(The map and following legend are accurate as of June 1954)
I think Odraport is still under construction, but the main basin (13 is finished, and
offers ample space for the ODRA fishing fleet. The port is located on a branch of the
Swina. The entrance to the port is marked by buoys (40). The main basin is about 200
meters long and about 70 meters wide. On the southeastern bank it has concrete quays,
well made and modern in construction (l4). Along this [see map is a little wooden
pier (20) for the local ferry going from Swina to Szczecin. Immediately behind this
pier is a two storey building in which different administrative offices are located as
is a WOP watch-tower (19). Travelling northeast along the quay there is an ice factory
with ice breaking machines for the fishing industry (42). Further to the northeast are
warehouses and fish-processing works (15). Next to them is a cold-storage (16) connected
by rail with the loading facilities. Next to this there is a small guard room of the
Industrial Guard (Strasz Przemyslowa) (17) and in the vicinity is a boiler room (18).
Warehouses and cold-storages are connected by a many-branched railway line, and with the
main line going north.
On the northwest side of the basin there are cranes (11), fuel stores, etc. (12) is
a crude-oil pump; (6) and (7) are stores and administrative buildings; (8) is a water
tank; (10) is the guard room of Strasz Przemyslowa; (9) is the main building of Strasz
Przemyslowa - Industrial Guard.
Further to the northwest is a small basin for the Swedish ferry; and also buildings of
the ODRA station connected with the other sections of the port by road and rail. All
this is numbered (1) (2) (3). In the northern part of the area is an empty lot for
development (5).
Southeast of the basin (13) and fish processing establishment, are shipyards for repair
and construction of fishing vessels. There are three or four slipways for fishing boats
(21), a jetty for mooring ships (24), a small basin (22) with dry dock for fishing boats
up to 1,000 tons (23). In one area (26) are various small establishments of the shipyards.
Building (27) houses mechanical workship; the two buildings (28) are carpenters' work-
shops; (29), (30), (39) and (32) are different barracks and warehouses. Building (33)
(34) is the WOP and UB office; (35) is the entrance to the
is a shop for the fishermen;
area and Industrial Guard post. Another entrance (31) is along the road to Kazimierzowo.
North of Kazimierzowo are additional warehouses (37) with a special Strasz Przemyslowa
post (43). Buildings market (37) are administrative. All of Odraport is surrounded by
barbed wire or net or brick fences and walls, as marked on the plan. The same applies
to the extra warehouses (37).
Approved For Release 2001/03/06 : CIA-RDP83-00423R001900930005-4
roved For Release 2001/03/06 : CIA-RDP83-00423R001900930005-4
Approved For Release 2001/03/06 : CIA-RDP83-00423R001900930005-4
Approved For Release 2001/03/06 : CIA-RDP83-00423R001900930005-4
K3
Approved For Releas ZQ04R31'66 : CIA-RDP83-00423R00 00939005-4
Approved For Release 2001/03/06 : CIA-RDP83-00423R001900930005-4
25X1A2g
oved For Release 2001/03/06 : CIA-RDP83-00423R001900930005-4
Approved For Release 2001/03/06 : CIA-RDP83-00423R001900930005-4
Approved For Release 2001/03/06 : CIA-RDP83-00423R001900930005-4