NPIC DATA SYSTEM DATA AND CONTROL SEGMENT ACQUISITION PHASE VOLUME VIII COST PROPOSAL QUESTIONS AND ANSWERS

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP84T00037R000400080001-9
Release Decision: 
RIPPUB
Original Classification: 
U
Document Page Count: 
67
Document Creation Date: 
December 28, 2016
Document Release Date: 
June 18, 2007
Sequence Number: 
1
Case Number: 
Publication Date: 
March 31, 1982
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP84T00037R000400080001-9.pdf1.4 MB
Body: 
Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 NPIC DATA SYSTEM DATA AND' CONTROL ' SEGMENT ACQUISITION PHASE f VOLUME VIII COST PROPOSAL QUESTIONS AND ANSWERS 31 Much 1992 UNCLASSIFIED Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 0 .0 V Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 UNCLASSIFIED NPIC DATA SYSTEM DATA AND CONTROL SEGMENT ACQUISITION PHASE VOLUME VIII COST PROPOSAL QUESTIONS AND ANSWERS This data, furnished in connection with this solicitation, shall not be disclosed outside the Government and shall not be duplicated, used, or disclosed in whole or in part for any purpose other than to evaluate the proposal; provided, that if a contract is awarded to this offeror as a result of, or in connection with, the submission of this date, the gOvetnlnen; shall have the right to duplicate, use, or disclose the data if, and to the extent, it is so provided in the contract. This restriction does not limit the government's right to use information contained in the data if it is rightfully obtained fr?m another source without restriction. The data subject to this restriction is contained in the pages appropriately marked. The data in the pages of this proposal where so annotated contains trade secrets and commercial or financial information that are either specifically exempted from disclosure by statute or privileged or confidential within the meaning of the exemption that is set forth in Section 552 (b) (3) and (4), respectively, of the Freedom of Information Act, 5 U.S.C. 552, the disclosure of which could invoke the criminal sanctions of 18 U.S.C. 1905. UNCLASSIFIED Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 UNCLASSIFIED ? ? IV.1 GFE Univac system software for SDL, Figure 3.7-2, Page IV.3-31 shows a GFE charge of $284K. Page IV.5-3, paragraph d, shows licensed S/W as a contractor cost. Please clarify. Answer: Cost of the Univac system software required for operation of the Univac 1100/81 in the SDL is included in our bid price. The GFE charge shown in Figure 3.7-2 (Page IV.3-31) was erroneously entered and has been removed from our March 31 GFE list. UNCLASSIFIED Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 UNCLASSIFIED 0 ? ? IV.2 Total LOCs from Table 5.5.2-2, page IV. 5-11, 12, is 1,205,000 lines after correcting for errors in the Table. Paragraphs 6.4, 5, pages IV.6-3, 4 show a total of 859,000 LOCs. Tables 5.5.2-4 and 5.5.7-5, page IV.6-15, show a total of 927,000 LOCs for the BOC and IOC. Also, reference Figure 5.4.1-1, page 11.5-28/29 in Volume II. Please clarify. Answer: Figure 5.5.2-2 accurately reflects the basis of our February 24 bid. The confusion arose due to our use of the total KSLOC quantity shown for the CPCI's and we have clarified this with an explanatory note on the figure. We have also provided at the bottom of the figure a table of total KSLOC counts for all the CPCI's. Paragraphs 6.4 - Software Development (BOC) and 6.5 - Software Development (IOC) which also reflected KSLOC estimates have been corrected as needed to match Figure 5.5.2-2. Figures 5.5.2-4 and 5 show a total of 854,000 LOC's which are the new and modified counts of the BOC/IOC code from Figure 5.5.2-2 (635,000) plus the BOC/IOC counts of BOC/IOC converted code (219,000 LOC's). UNCLASSIFIED Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 UNCLASSIFIED 0 Applying these data to the code count estimates, man month estimates and resultant aggregate productivities per CPCI were derived and are tabulated in Figure 5.5.2-2. N&M R&C* Total N&M R&C Total N&M R&C Total Pre -Exploitation - BOC 103 28 131 358 14 372 288 2000 352 B EPPRE - IOC 1 7 8 5 4 9 200 1750 888 - Tota l 104 35 128'''c 363 18 381 287 1944 336 Exp loitation Mgmt - BOC 67 26 93 208 5 213 322 5200 437 B EMGMT - IOC 14 32 46 51 16 67 275 2600 687 - Total 81 58 76;-:; 259 21 280 313 2760 271 Exp loitation Spt - BOC 31 133 164 82 30 112 378 4400 1460 B EXSUP - IOC 48 2 50 201 1 202 239 1750 248 - Total 79 135 50'^^ 283 31 314 279 4350 159 ? Exp loitation Results - BOC 7 21 28 19 5 24 268 4200 1170 B ERESU - IOC 0 21 21 6 6 3500 3500 - Total 7 42 21*%= 19 11 30 268 3800 700 Data Manipulation - BOC 21 88 109 54 20 74 389 4400 1470 BM ANIP - IOC 6 80 86 18 42 60 333 1900 1430 - Total 27 168 86%"^' 72 62 134 375 2700 642 Stat istics Reporting - BOC 7 23 30 22 5 27 318 4600 1100 BS TATR - IOC 2 18 20 5 10 15 400 1800 1330 - Total 9 41 20** 27 15 42 333 2700 475 *IOC and FOC estimates in the R&C column show counts of converted code but omit retained code counts. -'Total KSLOC quantities listed are the installed KSLOC's at FOC. ? Figure 5.5.2-2 (1 of 3) UNCLASSIFIED Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 UNCLASSIFIED 0 N&M R&C* Total N&M R&C Total N&M R&C Total Materials Mgmt - BOC 0 15 15 6 6 2500 2500 BMMGMT - IOC 1 8 9 4 4 8 250 2000 1120 - FOC 7 0 7 30 30 233 233 - Total 8 23 16** 34 10 44 235 2300 364 Command and Control - BOC 4 0 4 18 18 222 222 BCCNTR - IOC 20 0 20 87 87 230 230 - FOC 12 0 12 50 50 240 240 - Total 36 0 36** 155 155 232 232 Query Spt - BOC 3 40 43 12 14 26 250 2850 1650 BQUERY - IOC 16 23 39 71 12 83 225 1900 470 Total 19 63 39** 83 26 109 229 2400 358 ? Ho st Appl Spt - BOC 22 50 72 71 12 83 239 4250 819 BAPPLS - IOC 24 0 24 16 16 1800 1810 - Total 46 50 24** 71 28 99 239 2850 293 DB M Appl Spt - BOC 11 0 11 41 41 268 268 BDMAPS - IOC 8 0 8 33 33 242 242 - Total 19 0 16 * 74 74 257 216 Te st and Training Spt - BOC 35 6 41 121 2 123 289 3000 333 BTTDEV - IOC 8 5 13 27 1 28 296 5000 464 - FOC 5 0 5 17 17 294 294 - Total 48 11 48%.* 165 3 168 291 3700 286 ? Figure 5.5.2-2 (2 of 3) UNCLASSIFIED Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 UNCLASSIFIED 0 WS Application - BOC 35 0 35 172 172 203 203 WAPPLS - IOC 141 0 141 540 540 261 261 - Total 176 0 176%.:. 712 712 247 247 - BOC 346 430 776 - IOC 289 196 485 - FOC 24 0 24 - Total 659 626 735 ? ? Figure 5.5.2-2 (3 of 3) UNCLASSIFIED Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 ? N, M, &C* BOC Phase UNCLASSIFIED Cost Substantiation Data for CPCI Test and Verficiation CPCI KSLOC MM EST MANPOWER LEVEL 3 BEPPRE 126 74.1 6.5 343200 BEMGMT 67 43.8 4.6 343201 BERESU 7 3.8 1.4 343202 BMANIP 21 11.3 1.3 343204 BSTATR 7 4.4 1.0 343205 BCCNTR 4 2.7 0.5 343208 BQUERY 3 1.2 0.2 343209 BAPPLS 22 10.2 1.5 343210 BDMAPS 11 7.3 0.6 343211 BTTDEV 35 23.3 2.5 343212 WAPPLS 35 33.3 3.5 343213 BEXSUP 31 16.3 2.3 343214 TOTALS 369 231.7 ? IOC Phase PEAK WBS CPCI KSLOC MM EST MANPOWER LEVEL 3 BEPPRE 8 2.6 1.1 344200 BEMGMT 46 18.4 2.0 344201 BMANIP 86 26.8 3.0 344203 BERESU 21 6.0 2.0 344202 BSTATR 20 6.4 1.2 344204 BMMGMT 9 2.9 0.6" 344206 BCCNTR 20 13.3 2.0 344207 BQUERY 39 17.2 2.7 344208 BAPPLS 24 20.1 2.8 344209 BDMAPS 8 5.3 0.5 344210 BTTDEV 13 6.7 1.0 344211 WAPPLS 141 120.8 9.0 344212 BEXSUP 50 32.6 2.8 344213 is *KSLOC's for estimating test and verification efforts include new, modified and converted code (not retained code) and hence will differ from the KSLOC totals of Figure 5.5.2-2. UNCLASSIFIED Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 S UNCLASSIFIED Cost Substantiation Data for CPCI Test and Verficiation ? ? FOC Phase CPCI KSLOC MM EST PEAK MANPOWER WBS LEVEL 3 BMMGMT 7 7.6 1.4 345200 BCCNTR 12 8.0 1.6 345201 BTTDEV 5 3.3 1.0 354202 TOTALS 24 18.9 Figure 5.5.2-6 UNCLASSIFIED Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 ? is Cost Factors: In total, 1,000 analyst positions are equipped with the new IWS capabilities. Three types of work stations and their proposed costs are indicated in the table below: IWS Type Qty (1,000s) Basic 360 $ 8.0 Enhanced 140 15.2 Full Capability 500 36.7 Total 1,000 - 6.4 Cost Driver: Software Development BOC Software development effort leading to BOC will produce a total of 346,000 new and modified source lines at code (SLOC's) and 23,000 converted SLOC's. GWBS Reference: 4.3 Software Development BOC Technical Proposal Reference: 5.4 Software 5.5 Data Base 5.8 Integrated Work Station UNCLASSIFIED Size (KSLOC's) 6.5 Cost Driver: Software Development IOC Software development effort leading to IOC will produce a total of 289,000 new and modified source lines of code (SLOC's) and 196,000 SLOC's of converted code. ? GWBS Reference: 4.4 Software Development IOC UNCLASSIFIED Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 ? UNCLASSIFIED Technical Proposal Reference: 5.4 Software 5.5 Data Base 5.8 Integrated Work Station Management Proposal Reference: 5.3 Software Development Plan Size (KSLOC's) ? ? 6.6 Cost Driver: Development and Test Facility CPU's with peripherals and approximately 90 terminals for development. Facility operations during peak development and test periods are planned and costed for three shift, seven day per week operations. The Development and Test Facility at the will consist of three host 2bAl GWBS Reference: 4.16 Development and Test Facility Technical Proposal Reference: None Management Proposal Reference: 5.3 Software Development Plan 5.5 Verification and Test Plan Lease and Maintenance of Host Configurations and Software Products Facility Labor 6.7 Cost Driver: Operations and Maintenance IOC and FOC Operations and maintenance by the contractor following completion of D/C Segment IOC and extending through July, 1988, will include (1) level-of-effort labor for hardware and software maintenance; (2) purchased commercial hardware maintenance; and (3) purchased commercial software licensing and software service charges. UNCLASSIFIED Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 UNCLASSIFIED. 0 ? ? IV.3 Where are the costs for IWS spares? If this is a GFE item, please supply cost. Answer: We have defined and priced in our baseline and option bids for BAFO an initial spares program through FOC. Spares pricing has been based on MTBF historical data which yields an annual spares estimate of 4 percent of acquisition price for the Burroughs B20 equipment and an annual spares estimate of 7 percent of acquisition price for the Aydin equipment. The initial IWS spares costs through 1987 FOC included in our bids are as follows: Baseline Option A Option B Option C After FOC, experience will dictate what sparing is required. Our ROM estimate for post-FOC IWS spares is $1.3 million annually. UNCLASSIFIED Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 UNCLASSIFIED 0 IV. 4 Identify specifically where the maintenance costs for the SDL H/W are. Answer: The maintenance costs for SDL commercial hardware are included in WBS element 541640, Operations and Maintenance for the Development and Test Facility of SDL. ? ? 11 UNCLASSIFIED Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 UNCLASSIFIED 0 ? IV.6 O&M S/W Maintenance Personnel (Appendix C2, page 146) - two people (one contractor, one Government) between BOC and IOC and four people after IOC seems very low for the amount of S/W that will be maintained. Page IV.5-2 describes an O&M contingent of up to 14 (or 28?) system programmers and up to 3 (or 6?) personnel for IWS maintenance. Please discuss the O&M area in greater detail. Answer: A. O&M S/W Maintenance Personnel (Appendix C2, page 146) - Two people (one contractor, one Government) between BOC and IOC and four people after IOC seems very low for the amount of S/W that will be maintained. During BOC, 1 programmer will be dedicated to IWS soft- 25X1 ware maintenance. IOC and FOC will also require 1 25X1 programmer for IWS software maintenance. During all phases of the IWS development effort, the software development personnel will also serve as maintenance programmers on call as needed basis to the O&M maintenance programmers. This approach to IWS S/W maintenance is very practical and cost effective due to our closeness to the NPIC operations site. B. Page IV.5-2 describes an O&M contingent of up to 14 (or 28?) system programmers and up to 3 (or 6?) personnel for IWS main- tenance. (2 S/W and 12 H/W) maintainers for IWS O&M maintenance. maintenance during BOC. IOC and FOC will require 5 ~(2 S/W and 11 H/W) maintainers will be dedicated to the IWS O&M required for total O&M maintenance. Out of these total personnel. During IOC and FOC personnel will be Our total O&M maintenance requirements for BOC are 15 ? 13 UNCLASSIFIED Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 25X1 25X1 25X1 25X1 25X1 Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 UNCLASSIFIED S C. Please discuss the O&M area in greater detail. After acceptance of each D/C Segment delivery will share on-site 25X1 hardware/software maintenance support. On-site H/W maintenance support sill be limited to the IWS. Then ADPE equipment will be serviced 25X1 by the Fustomer Engineers who are presently servicin~_~quip- ment at the site and this maintenance team will be expanded as appropriate as the news equipment is installed. 25X1 will each initially provide 50% of the personnel for S/W maintenance. Over the O&M period," participation will increase 25X1 towards ultimately taking total responsibility. Figure 6-1 illustrates the numbers of personnel required during the O&M period. ? ? 14 UNCLASSIFIED Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 ? UNCLASSIFIED ? CE 11 N/A S CE 12 N/A 10 UNDER UNDER LEASE LEASE AGREE AGREE Figure 6-1 ? UNCLASSIFIED Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 ? ? UNCLASSIFIED IV.7 NDS program source and object code listings, user's manuals and operations manuals are complete and up to date. CPCI Part I and Part II documents exist but have not been maintained since about 1977. You have reviewed our documen- tation. Please verify that your proposal takes the existing NDS documentation deficiencies into account. Answer: NDS CPCI Part I and Part II specifications were requested GFE (Cost Prop Fig. 3.7-2) on CPCIs for which we do not have copies. This request should also include the cost of updating the specifications we now have to reflect the current system. The advantage of this activity is realized by the fact that our BOC proposed system will contain a significant amount of retained software supporting existing functions and additional converted and slightly modified software from the current system. This documentation will permit us to increase our proficiency on the existing software. UNCLASSIFIED Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 ? is ? UNCLASSIFIED IV.8 Your analysis for subcontractor costs is considerably Less than the subcontractors proposed. Have the revised costs been agreed to by the subcontractors? Discuss the probability that the revised costs will be met. Answer: Our February 24 bid to the Government reflected an aggregate sub- contractor bid price which was approximately[ ess than their 25X1 bids to us at that point in time. Our bid price included a carefully- derived, bottoms-up "should cost" estimate for each subcontractor, at Level 6 of the WBS. After proposal submittal, we worked with each subcontractor to clarify task responsibilities and development methodology. This process has reduced the aggregate difference 25X1 to approximately= as reflected in our BAFO submittal. We are 25X1 about to begin detailed fact-finding and negotiations, and we expect to reach agreement at our bid position. UNCLASSIFIED Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 UNCLASSIFIED 0 ? ? IV.9 Volume IV, pages 3-21, 3-28, have inconsistencies in WBS elements 4.8, 4.9. Volume IV, pages 3-21, 6-5, have inconsistencies in WBS element 4.18. Please clarify. The accumulation of costs in this area was a result of the factoring of subcontract type activity. The amount to be used for analytical purposes is the figure reflected in Exhibit 1 (page 3-21). The amount to be used for analysis of WBS element 4.18 is the amount reflected in Exhibit 1 (page 3-21). UNCLASSIFIED Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 UNCLASSIFIED 0 IV.10 Volume IV, Section 9 (per RFP Amendment 1) is missing. Please provide. Answer: Section 9, O&M Costs, has been incorporated into the March 31, 1982 updated Cost Proposal per Amendment 1. ? ? 19 UNCLASSIFIED Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 UNCLASSIFIED 0 IV.11 It appears as though SDC is purchasing the Full Capability IWS (Appendix C-10, page 274). Why is this purchase in this element (448222)? Who are they being purchased from? Answer: 1. The Full Capability IWS is comprised of two major subsystems; the Alpha Numeric (A/N) display and the Imagery display. The A/N display is being purchased from the Burroughs Corporation and is its model B-20 with TEMPEST qualification. ? The Imagery display is being purchased from the and is then model 5216 - modified. The modifications include the TEMPEST qualification of a data entry device (trackball, mouse, or joystick) and other minor modifications to reduce its production cost. SDC will integrate the two subsystems into the Full Capability IWS. 2. Why is this purchase in this element WBS #448222? ? Answer: Procurement of the Full Capability IWS hardware was erroneously budgeted in WBS #448222. It should have been budgeted in WBS # 448232, Development. UNCLASSIFIED Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 25X1 25X1 Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 UNCLASSIFIED 0 ? ? 17.12 Reference" cover Letter dated February 24, 1982 - Assumption (Attached). Please identify specific TBR's/TBD's referred to in Assumption 2 as well as Answer: specific cost/schedule assumptions. Please reference the specific WBS elements in Appendices C-1 and C-10 where the costs are included. Proposal Assumption #2 refers to all TBR/TBD issues in the RFP. We have included in our proposal adequate cost and sufficient development schedule to implement the resolution of all TBR/TBD issues provided such resolution is within ranges and assumptions cited throughout the proposal. We have taken a position in the proposal on all TBD/TBR issues in terms of ranges and assumptions. Costs for resolution of TBR/TBD issues have not been segregated in our development of cost information, but rather have been taken into consideration in the basic overall cost estimating procedures for each task activity assuming that all TBR/TBD issues would be resolved within the prescribed ranges and assumptions. UNCLASSIFIED Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 UNCLASSIFIED 0 ? ? IV.14 How are the SDL terminals acquired? What happens to them after the main frame (3081) is moved to NPIC? Answer; Twenty-six of thc:l 3278-2 terminals will be purchased for the initial Software Development Laboratory (SDL) configuration (on 5/82) and 24 3278-2 terminals will be leased. More leased terminals will be added to the development laboratory after 12/82 as the development effort terminal requirements grow. The 26 purchased 3278's will be transferred to site for BOC (1/84) and will be replaced by leased terminals. The SDL IWS terminals will be purchased by the Government under the NDS contract while the Delta Data 5600 terminals will be GFE The IWS terminals at the SDL will be installed at site when the SDL is disbanded. The Delta Data 5600's will be returned to the Government upon removal of the Univac 1100/8X from the SDL. UNCLASSIFIED Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 UNCLASSIFIED ? IV.15 What is included in the 4.1.8 PM-Documentation manhours? Answer: This is technical publications department effort to prepare and publish all briefing materials and all deliverable CDRL documents. Effort includes drafting, photographic work and all printing and binding. ? ? 24 UNCLASSIFIED Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 UNCLASSIFIED 0 IV.16 Please provide total indirect manhours by WBS-2 (use Exhibit 5 format) summing all contractors. Provide supporting narrative explaining what each element includes. Answer: Our overhead is allocated on the basis of direct hours incurred on the contract and cannot be readily identified with a specific product or contract. These overhead expenses include accounting and financial services, personnel administration, normal office functions, general administration and such items as light, heat, power, taxes and employee benefits. Indirect subcontractor data is considered proprietary by the subcontractors and is available for audit by a cognizant agent of DCAA. ? ? 25 UNCLASSIFIED Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 UNCLASSIFIED S ? IV.17 Appendix C1 is apparently missing data. For example, WBS elements 542402, 542501, 542502. Appendices C2 and C3 are apparently missing data which are costed in C1, for example, WBS elements 541402, 541820, 541830, 541831. Please review Appendices C1, C2, C3, C10 and provide the missing data. Answer: Our review of Appendix C1 indicates that all man-hour data corresponding to our basic bid was complete at the February 24 submittal but was not matched to the WBS Index sequence. Our updated submittal of March 24, 1982 provided Appendix C1 properly sequenced with the WBS Index and tabbed in level 2 categories for quicker reference. Appendix C2 (WBS Index) has been maintained in its original sequence which matches the Government Work Breakdown Structure. Appendix C2 submitted March 24 is a marked up version edited to bring it into corres- pondence with Appendix C1. As now edited, it reflects the correct level 5 WBS elements for our March 31 BAFO bid package. Adjustments are of four types: (1) Some level 5 WBS elements which were erroneously omitted, have been added. (2) Some level 5 (and level 6) WBS elements have been marked reserved where it was determined that they were not required for the basic bid; no Appendix C1 data sheets exist for these. (3) In a few instances, costs intended to go into one level 5 element were erroneously budgeted in another WBS element. These instances are appropriately identified. (4) In a few instances, a level 5 WBS element contains only purchase, computer, or travel cost and no labor costs. These instances are not annotated in the Index; no Appendix C1 data sheets exist for these. ? UNCLASSIFIED Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 UNCLASSIFIED 40 ? ? Appendix C10 has been reviewed and accurately reflects our March 31 bid package. Revised versions of Appendices C1 and C2 are included with our March 31, 1982 Best and Final packages. UNCLASSIFIED Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 UNCLASSIFIED 41 ? IV.18 Please provide an index in WBS order showing what page each WBS element is on for Appendix C1 and C10 (not required for the computer listing of C10). Answer: As described in the response for question 17, we have re-ordered the Appendix C1 data sheets to exactly sequence with the Appendix C2 WBS Index. The Index, in the column titled WBS Code Number, provides the level 5 element number which in turn appears on each data sheet of Appendix C1. ? 28 UNCLASSIFIED Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 UNCLASSIFIED 0 IV.19 Why is there no labor required for SDL management 4.16.1? Answer: The SDL management labor was erroneously budgeted in WBS element 541640, SDL Operations and Maintenance, in our February 24 submittal. For the BAFO bid, this management labor has been budgeted in its appropriate place, WBS element 541610. Detailed WBS level 5 data is included in our revised Appendix Cl. ? ? 29 UNCLASSIFIED Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 UNCLASSIFIED 0 IV.20 What is included in the SDL 00 manhours, 4.16.4? Answer: Included in the SDL O&M manhours are the following skill categories which operate and maintain the development and test facility: Manager System Engineer System Programmer Computer Operator Clerk-Librarian The attached figure aids in understanding the manpower levels we have provided in each category in our BAFO bid. ? ? 30 UNCLASSIFIED Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 ? Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 V 5/82 12/82 6/83 12/83 6/84 12/84 3081 I-2 Shifts 5 Days 3 Shifts 5 Days- 1 Shift Sat 1- Shifts Sat/Sun C ~--1 Shift 5 Days I 11z Shifts 7 Days 2 ^ 4341 r I--1' Shifts 7 Days 1 Shift 5 Days ?~ V J Operators 1st 1.5 4.5 6.5 5.5 2nd 3.5 6.5 6.5 7.5 110.5 19.5 M 3rd 0 Manager 1.5 2 3 Syst Engrg .5 Syst Prog 3 Admin .5 1 Figure 6. Development & Test Facility Labor WP4/ 341640 Attachment to Cost Question 20 12 Shifts-] 7 Days ? 77 17 102 36 Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 UNCLASSIFIED 0 ? IV.21 Please provide C-1, C-10 data for CPCI BEPPRE (4.3.2.0 and 4.4.2.0). Answer: This data is attached hereto and is now incorporated in the revised Appendices C-1 and C-10. ? UNCLASSIFIED Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 Next 16 Page(s) In Document Denied Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 ? ? ? UNCLASSIFIED IV.22 Please explain why you recommend purchase rather than alter- nate payment plan for the ADPE procurement? Answer: The Basic Bid reflects our lowest cost approach for meeting SAP technical objectives. An alternate payment plan for ADPE incurs additional interest expense and, for that reason, was not included. For each of our proposed options, the objective is to reduce development costs through FY '85. In support of that, we have included a five-year alternate payment plan in each. Again, in an effort to minimize total program cost, we have reflected the final payment of all ADPE in FY '86. The Government, of course, has the option to continue the five-year plan beyond FY '86, incurring additional interest charges. UNCLASSIFIED Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 UNCLASSIFIED IV.23 As a further enhancement of our security measures for the protection of highly sensitive information, the Government has initiated a voluntary program in industry which provides for the polygraph interview of contractor personnel who will require access to such information. The polygraph coverage under this program is limited to counterintelligence issues. Please indicate your willingness or unwillingness to partici- pate in this Industrial Contractor's Polygraph Program (ICPP). Answer: Will Participate Yes ? ? 51 UNCLASSIFIED Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 UNCLASSIFIED 40 ? ? IV.24 Please provide cost and price deltas to run the SDL through FY-88. Answer: A ROM to run the SDL through FY88 would b UNCLASSIFIED Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 UNCLASSIFIED 0 IV.25 Do you propose to continue the CWBS used in C-1 and C-10 for the duration of SAP? Answer: Yes, with simplification to reduce the number of work packages. The revised CWBS will be reviewed with NDPO to ensure desired Government visibility. ? ? 53 UNCLASSIFIED Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 UNCLASSIFIED 0 IV. 26 Please provide a chart of all Univac andu computers needed 25X1 per your basic proposal at both your factory and our facility in the following format: CONTRACTOR FACILITY GOVERNMENT FACILITY Any computer which moves from one facility to another should be so indicated. Number each entry on the above graph and provide associated schedule and cost data in the following format: ? Entry #: For each unit in that configuration by model number: number of units, unit purchase price, unit Lease price, number of months leased, total unit Lease price, maintenance price, software Lease price, total life cycle unit costs exclusive of operators and consumables. Entry #: Total hardware cost, total software lease price, total maintenance cost and total Life cycle cost exclusive of operator and consumable costs. A. Provide the above information for your basic proposal Volume 5 configuration. B. Provide the above information for your revised proposal Volumes 4, and 5 if different form your basic proposal. Answer: Summary and detailed data in response to part A of the question are contained in Figures XXVI-1 through XXVI-17, and 26-VI through 26-VS. Summary and detailed data in response to part B are contained in Figures XXVI BC-1 through XXVI BC-4. ? 54 UNCLASSIFIED Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 1, m ? Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 0 D/C Segment Development and Test Laboratory Equipment Schedule 1982 1983 1984 1985 10 2Q 30 40 10 20 30 40 10 20 30 40 10 20 30 40 Univac 1100/8x (50 Terminals) 5/82 ~ Della Data 5600 1 2 Prod. 1 Prototype IWS (Basic) Basic 8/83 1/84 1/85 1 I (Purchased) 1/84 (Leased) switch & Peripherals Government (Purchased) Site 1/84 O (Purchased) Switch & 1/84 Peripherals No. 1 (GFE) Entry Y Univac 1/84 1100/84 (Basic) IWS 1/84 1986 10 20 30 40 1981 10 20 30 40 Figure XXVI-1. Equipment Phasing at Contractor and Government Facilities 1 7/81 2/87 (Enh. & Full Cap ? 25X1 25X1 C z 25X1 D 25X1 'V^/ V m 25X1 m 25X1 Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 2 Pre-Prod. Enhanced & 2 Prod. Enhanced & 2 Pre-Prod. Full Cap. 2 Prod. Full Cap. i i ----- ~ 2/87 3186 9/86 ? Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 - ? 1982 1983 1984 1985 1986 1987 M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D Hardware Group B Entry B Lab Entry B Site C L b Entry C a Entry C Site D Entry D Lab Entry D Site E Entry E Lab Entry E Site G Lab Entry G Si Entry G te L b Entry I a Site Entry I J Lab Entry J Entry J Site K Entry K Lab Entry K Site Figure XXVI-2. Computer Phasing at Contractor and Government Facilities - Baseline and Option A m Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 Next 16 Page(s) In Document Denied Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 ? - ? 4341 PROCESSORS AND PERIPHERALS FY 82 83 84 85 86 87 88 TOTAL 56495 161338 439066 299754 - - - 9 3 39 C ^Z r r V, CO M m Equipment in this group is priced at internal lease rates which typically yield a discount of 60% on commercial pricing. Lease data is summarized by fiscal year above. Detailed unit pricing at internal rates was unavailable at time of proposal publication. M Figure 26-14. (1 of 2) 0 ADPE Cost Summary Lease o Hardware m 25X1 Groups A, F, H and L for Laboratory (Revised v Proposal) Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 is Type/Feature # Figure 26-14 (2 of 2) Revised Proposal ? ? 4341-M02 3278-002 3278-A02 3278-002 3705-J04 3203-005 1416-001 3814-A03 3880-D13 3380-AA4 3803-002 3420-008 3274-D21 3274-D21 3278-002 3287-001 3350-A02 3350-B02 3880-003 3880-AA4 3278-A02 3705-J04 UNCLASSIFIED Processor-8M Display Station Display Console Display Station Comm. Controller Printer Interch Train Cart. Switch Mgt. Sys. Contr. Storage Control DASD Tape Control Magnetic Tape Unit D21 Control Unit D21 Control Unit Display Station Printer Disk Storage & CTL Disk Storage Storage Control DASD Display Console Comm. Controller Display Stations UNCLASSIFIED 8205-8503 8205-8503 8205-8503 8301-8503 8401-8503 8401-8503 8401-8503 8401-8503 8401-8503 8401-8503 8401-8503 8401-8503 8401-8503 8401-8503 8401-8503 8401-8503 8401-8503 8401-8503 8401-8503 8401-8503 8401-8503 8406-8503 Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 ? Approved For Release 2007/06/1 8: CIA -RDP84T00037R000400080001-9 ? 4341 PROCESSORS AND PERIPHERALS FY 82 83 84 85 86 87 TOTAL Equipment in this group is priced at internal lease rates which typically yield a discount of 60% on commercial pricing. Lease data is summarized by fiscal year above. Detailed unit pricing at internal rates was unavailable at time of proposal publication. Figure 26-15. (1 of 3) _ DPE Cost Summary Lease of Hardware Groups A, F, H and L ~,orr Laboratory (Option A) Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 UNCLASSIFIED ? Figure 26-15 (2 of 3) Option A Type/Feature # Description Quantity 4341-M02 Processor-8M 1 8205-8503 3278-002 Display Station 24 8205-8503 3278-A02 Display Console 1 8205-8503 3278-002 Display Station 26 8301-8503 3705-J04 Comm. Controller 1 8401-8503 3203-005 Printer 3 8401-8503 1416-001 Interch Train Cart. 3 8401-8503 3814-A03 Switch Mgt. Sys. Contr. 2 8401-8503 3880-D13 Storage Control 1 8401-8503 3380-AA4 DASD 8 8401-8503 3803-002 Tape Control 3 8401-8503 ? 3420-008 Magnetic Tape Unit 8 8401-8503 3274-D21 D21 Control Unit 2 8401-8503 3274-D21 D21 Control Unit 1 8401-8503 3278-002 Display Station 28 8401-8503 3287-001 Printer 11 8401-8503 3350-A02 Disk Storage & CTL 2 8401-8503 3350-B02 Disk Storage 2 8401-8503 3880-003 Storage Control 2 8401-8503 3880-AA4 DASD 4 8401-8503 3278-A02 Display Console 1 8401-8503 3705-J04 Comm. Controller 2 8406-8503 ? UNCLASSIFIED Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 UNCLASSIFIED ? Figure 26-15 (3 of 3) Option A Type/Feature # 4341-P02 Processor 1 8212-8304 3278-002 Display Station 5 8212-8304 3278-A02 Display Console 1 8212-8304 4341-P02 Processor 2 8503-8702 3278-002 Display Station 50 8503-8702 3278-A02 Display Console 2 8503-8702 3287-001 Printer 4 8503-8702 3880-Dll Storage Control 2 8503-8702 3350-A02 Disk Storage CTL 4 8503-8702 3880-003 Storage Control 1 8503-8702 ? 3380-AA4 DASD 4 8503-8702 3380-B04 DASD 2 8503-8702 3803-002 Tape Control 4 8503-8702 3420-008 Mag. Tape Unit 12 8503-8702 3203-005 Printer 4 8503-8702 1416-001 Interch Train Cart. 4 8503-8702 3350-B02 Disk Storage 2 8503-8702 3274-D21 Control Unit 2 8503-8702 3705-J04 Comm. Controller 2 8503-8702 3278-002 Display Station 30 8303-8503 ? UNCLASSIFIED Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 ? Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 4341 PROCESSORS AND PERIPHERALS FY 82 83 84 85 86 87 TOTAL Equipment in this group is priced at internal lease rates which typically yield a discount of 60% on commercial pricing. Lease data is summarized by fiscal year above. Detailed unit pricing at internal rates was unavailable at time of proposal publication. Figure 26-16 (1 of 3) ADPE Cost Summary Lease of ~ ardware Groups A, F, H and L for Laboratory (Option B) ? 11 m v 25X1 Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 ? Figure 26-16 (2 of 3) Option B Type/Feature 11 4341-M02 Processor-8M 1 8205-8503 3278-002 Display Station 24 8205-8503 3278-A02 Display Console 1 8205-8503 3278-002 Display Station 26 8301-8503 3705-J04 Comm. Controller 1 8401-8503 3203-005 Printer 3 8401-8503 1416-001 Interch Train Cart. 3 8401-8503 3814-A03 Switch Mgt. Sys. Contr. 2 8401-8503 3880-D13 Storage Control 1 8401-8503 3380-AA4 DASD 8 8401-8503 3803-002 Tape Control 3 8401-8503 ? 3420-008 Magnetic Tape Unit 8 8401-8503 3274-D21 D21 Control Unit 2 8401-8503 3274-D21 D21 Control Unit 1 8401-8503 3278-002 Display Station 28 8401-8503 3287-001 Printer 11 8401-8503 3350-A02 Disk Storage & CTL 2 8401-8503 3350-B02 Disk Storage 2 8401-8503 3880-003 Storage Control 2 8401-8503 3880-AA4 DASD 4 8401-8503 3278-A02 Display Console 1 8401-8503 3705-J04 Comm. Controller 2 8406-8503 ? UNCLASSIFIED Display Console UNCLASSIFIED Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 UNCLASSIFIED ? Figure 26-16 (3 of 3) Type/Feature # Description Quantity 4341-M02 Processor-8M 1 8503-8702 3278-002 Display Station 24 8503-8702 3278-A02 Display Console 2 8503-8702 3880-D11 Storage Control 1 8503-8702 3278-002 Display Station 51 8503-8702 3705-J04 Comm. Controller 3 8503-8702 3203-005 Printer 3 8503-8702 1416-001 Interch Train Cart. 3 8503-8702 3814-A03 Switch Mgt. Sys. Contr. 2 8503-8702 8 x 4 3880-D13 Storage Control 3 8503-8702 ? 3380-AA4 DASD 3 8503-8702 3380-D04 DASD 5 8503-8702 3803-002 Tape Control 3 8503-8702 3420-008 Magnetic Tape Unit 8 8503-8702 3274-D21 Control Unit Terminal Dept. 2 8503-8702 3274-D21 Control Unit 1 8503-8702 3287-001 Printer 11 8503-8702 3350-A02 DASD 2 8503-8702 3350-B02 DASD 2 8503-8702 3880-003 Storage Control 1 8503-8702 3380-AA4 DASD 4 8503-8702 3287-001 Printer 1 8503-8702 3880-B04 DASD 1 8503-8702 3278-002 Display Station 15 8303-8503 ? UNCLASSIFIED Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 ? Approved For Release 2007/06/1 8: Cl A-RDP84T00037R000400080001-9 4341 PROCESSORS AND PERIPHERALS M m FY 82 83 84 85 86 87 TOTAL 56495 198274 15720 631385 1141272 391412 2434558 Equipment in this group is priced at internal lease rates which typically yield a discount of 60% on commercial pricing. Lease data is summarized by fiscal year above. Detailed unit pricing at internal rates was unavailable at time of proposal publication. Figure 26-17 (1 of 3) PE Cost Summary Lease of ardware Groups A, F, H and L for Laboratory Option C Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 UNCLASSIFIED ? Figure 26-17 (2 of 3) Option C Type/Feature # Description Quantity 4341-MO2 Processor-8M 1 8205-8503 3278-002 Display Station 24 8205-8503 3278-A02 Display Console 1 8205-8503 3278-002 Display Station 26 8301-8503 3705-J04 Comm. Controller 1 8401-8503 3203-005 Printer 3 8401-8503 1416-001 Interch Train Cart. 3 8401-8503 3814-A03 Switch Mgt. Sys. Contr. 2 8401-8503 3880-D13 Storage Control 1 8401-8503 ? 3380-AA4 DASD 8 8401-8503 3803-002 Tape Control 3 8401-8503 3420-008 Magnetic Tape Unit 8 8401-8503 3274-D21 D21 Control Unit 2 8401-8503 3274-D21 D21 Control Unit 1 8401-8503 3278-002 Display Station 28 8401-8503 3287-001 Printer 11 8401-8503 3350-A02 Disk Storage & CTL 2 8401-8503 3350-B02 Disk Storage 2 8401-8503 3880-003 Storage Control 2 8401-8503 3880-AA4 DASD 4 8401-8503 3278-A02 Display Console 1 8401-8503 3705-J04 Comm. Controller 2 8406-8503 4341-PO2 Processor 1 8212-8304 3278-002 Display Stations 5 8212-8304 3278-A02 Display Console 1 8212-8304 ? UNCLASSIFIED Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 UNCLASSIFIED Figure 26-17 (3 of 3) Type/Feature # Description Quantity 4341-M02 Processor-8M 1 8503-8702 3278-002 Display Station 24 8503-8702 3278-A02 Display Console 2 8503-8702 3880-Dll Storage Control 1 8503-8702 3278-002 Display Station 51 8503-8702 3705-J04 Comm. Controller 3 8503-8702 3203-005 Printer 3 8503-8702 1416-001 Interch Train Cart. 3 8503-8702 3814-A03 Switch Mgt. Sys. Contr. 2 8503-8702 ? 8 x 4 3880-D13 Storage Control 3 8503-8702 3380-AA4 DASD 3 8503-8702 3380-D04 DASD 5 8503-8702 3803-002 Tape Control 3 8503-8702 3420-008 Magnetic Tape Unit 8 8503-8702 3274-D21 Control Unit Terminal Dept. 2 8503-8702 3274-D21 Control Unit 1 8503-8702 3287-001 Printer 11 8503-8702 3350-A02 DASD 2 8503-8702 3350-B02 DASD 2 8503-8702 3880-003 Storage Control 1 8503-8702 3380-AA4 DASD 4 8503-8702 3287-001 Printer 1 8503-8702 3880-B04 DASD 1 8503-8702 ? UNCLASSIFIED Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 ? Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 s- ? C 2 0 r Cl) C I 'n m v Government Site Univac 1100/Bx Delta Data 6600 Switch & Peripherals Switch Peripherals No. 1 Univac 1100/84 IWS D/C Segment Development and Test Laboratory Equipment Schedule 1982 10 20 30 40 5/82 I(50 Terminals) 1983 10 20 30 40 1984 10 20 30 40 1985 10 20 30 40 (GFE) 12/82 6/86 2 Prod. 1 Prototype IWS (Basic) Basic Start Full Capability 8/83 1/84 - -1/85 _ - - - - (Purchased) 1/84 (Leased) 12/82 I (Purchased) 1/84 i O (Purchased) 1/84 I Entry Z 1/84 I (Basic) 1/841 1 Figure XXVI B/C-l. Equipment Phasing of Contractor and Government Facilities Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 1986 10 20 30 40 1987 10 20 30 40 2 Pre-Prod. Enhanced & 2 Prod. Enhanced & 2 Pre-Prod. Full Cap. 2 Prod. Full Cap. -i__ t 2/87 3/86 9/86 8/87 (Enh. & Full Cap ) P 25X1 25X1 C 225X1 0 r -25X1 ^ ~ C I W ttatttt~ 25X1 m 025X1 ? Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 is 1982 1983 1984 1985 1986 1987 M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D Hardware Group B Entry B Lab Entry B Site C Entry C Lab Entry C Site D Entry D Lab Entry D Site E Entry E Lab Entry E Site G Lab Entry G Entry G Site I Entry I Lab Entry I Site J Lab Entry J Site K L b Entry K a Entry K Site Figure XXVI B/C-2. Computer Phasing at Contractor and Government Facility - Option B & C C z n r '^ Cl ) Cl) M m Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 Next 4 Page(s) In Document Denied Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 ? Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 ? 11 m v 12/81 12/82 12/83 12/84 12/85 12/86 12/87 7/88 Entry M714341 Lease A Contractor Facility Entry N 1-1100/84 Purchase X X Entry 0 1-1100/84 Government Purchase Entry P 2-1100/84's Purchase Facility Figure 26-VI Computer Phasing at Contractor and Government Facilities - Volume V, Alternate Configuration Analysis d Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 Next 16 Page(s) In Document Denied Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 UNCLASSIFIED ? IV.27 Please clarify what is included in "non-corronercial spares" (Vol. IV, page IV. 5-3) . Answer: IWS spares were referred to as non-commercial spares to differentiate them from the ADPE commercial spares which are supplied and costed under a commercial maintenance agreement. r ? 110 UNCLASSIFIED Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 UNCLASSIFIED i r go IV.28 Your cover Letter implies that Vol. V is not an offer to be considered for acceptance by the Government. State how this complies with the RFP. Answer: Our understanding of the RFP relative to Volume V was that there was no requirement for an offer to implement the system using the Alternate Configuration. The RFP only required a comparative analysis to the preferred solution and rough-order-of-magnitude cost deltas to the preferred configuration. Jmarketing practices preclude us from offering to implement a system using other manufacturers' equipment when there is~quipment that will do the job. UNCLASSIFIED Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 25X1 25X1 Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 UNCLASSIFIED 0 ? 1. For options B&C please clarify the deinstallation data for the Univac 1100/84. Answer: The deinstallation data for the Univac equipment is reflected in Volume IV, Section 10. UNCLASSIFIED Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 UNCLASSIFIED 0 ? t 2. Please estimate the GFE cost for the Univac 1100/84 (including base, maintenance.and commercial S/W) for all options which use their computer. Answer: The costs for all GFE equipment are reflected in the response to Question IV.26. UNCLASSIFIED Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 UNCLASSIFIED 40 ? ? 3. Say again whether the design margin is reduced in the "BAFO" outlook. Answer: Our design margin requirement is unchanged at 100%. For BAFO, we have replaced the purchase of processor with the required development margins with processors that are field-upgradable to (and, in fact, beyond) the required margins. If our current performance projections hold during the SAP, the upgrade would not be required. If, however, the processing requirement grows, the processors could be expanded to meet the need. UNCLASSIFIED Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 UNCLASSIFIED ? ? 41 4. Will the prices for all commercial hardware (including maintenance) be firm prices in the "BAF". Answer: All commercial hardware prices in the "BAF" are firm. In addition, our ADPE special price offers the Government price protection on the D/C Segment proposed configuration. UNCLASSIFIED Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 UNCLASSIFIED a is 5. Please supply the configuration (including the equipment List) for the Univac 1100/84 for all options which use that computer system. Answer: The configuration information requested is defined in the response to Question IV.26. UNCLASSIFIED Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9 UNCLASSIFIED Approved For Release 2007/06/18: CIA-RDP84T00037R000400080001-9