REQUEST FOR DELEGATION OF CONTRACTING AUTHORITY - MAINTENANCE OF ROOFING

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP86-00800R000200110021-2
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
2
Document Creation Date: 
December 16, 2016
Document Release Date: 
July 20, 2005
Sequence Number: 
21
Case Number: 
Publication Date: 
August 3, 1981
Content Type: 
MF
File: 
AttachmentSize
PDF icon CIA-RDP86-00800R000200110021-2.pdf98.29 KB
Body: 
U r I L", ~A G Approved r Release 2005/08/02 : CIA-RDP86-OMMOR000200110021-2 3 AUG 1981 MEMORANDUM FOR: Director of Logistics ATTENTION: FROM: SUBJECT: Chief, Real Estate and Construction Division/OL Director of Training and Education Request for Delegation of Contracting Authority - Maintenance of Roofing 1. This memorandum is a request for contractin authority to be delegated for the execution. and a. ministration of a contract or per.ormin main- tenance to various roofing surfaces on buildings The current working estimate for this project is $102,000. 2. The majority of the permanent-type buildin s now exist- in in the early 1960's. In most instances, these roofs are of built-up type construction and installed on roof slopes of '2 in 12' and '3 in 12'. The ex erience at this facility is that the graveled surfaces of these roofs have washed downward exposing large areas of under- surface tar and/or felt layers at the ridge lines. Failures in the gravel stops at the eaves have allowed water to migrate on those buildings with wooden roof construction causing rotting of the wooden materials, i.e.,-sheathing boards and fascia. 25X1 25X1 In consultation with in the imme- 25X1 diate area, they are in the process of correcting some of these deficiencies utilizing low slope shingle applications wherever possible. It is planned under this contract to utilize this method of resurfacing to those roofs where replacement is justi- fied. Other roofs will he repaired or replaced as the need dic- tates. With the normal life of built-up roofs in this area being 25X1 .t -Hli IA L L Approved For Release 2005/08/02 : CIA-RDP86-00800R00020011002~ T2 3249 Approved r Release 2005/08/02 : CIA-RDP86-0 0R000200110021-2 SUBJECT: Request for Delegation and Contracting .Authority - Maintenance of Roofing 20 years, these structures are approaching life expectancy and programmed replacement/correction is in order. Contract plans and specifications are currently under preparation with in-house 25X1 25X1 the authority to execute and administer a com- petitive Lump sum bid contract in the amount not to exceed $110,000 for the described work. The contract will. be executed no later than 30 September 1981, and. contract administration will be in accordance with Funds in 25X1 the amount of $110,00 are available in Fiscal Year 1981 25X1 budget for performance of this maintenance-type work. 25X1 25X1 12 AUG 1981 Distribution.: Orig - Return to DTE 2 - D/L Distribution: LLB'' OL/RECD 1 -? D/L Chrono 1 - OL Files It is requested that the Director of Logistics delegate Approved For Release 2005/08/02 : CIA-RDP86-0080OR000200110021-2