SUPPLEMENT 7 TO JOINT EVALUATION OF SOVIET MISSILE THREAT IN CUBA

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
06505270
Release Decision: 
RIPPUB
Original Classification: 
U
Document Page Count: 
3
Document Creation Date: 
May 23, 2025
Document Release Date: 
April 24, 2025
Sequence Number: 
Case Number: 
F-2013-00646
Publication Date: 
October 27, 1996
File: 
Body: 
Approved for Release: 2025/04/07 C06505270 TO53.--SECIZET DINAR CHESS IRONBARK SUPPLEMENT 7 TO JOINT EVALUATION OF SOVIET MISSILE THREAT IN CUBA. PREPARED BY Guided Missile and Astronautics Intelligence Committee Joint Atomic Energy Intelligence Committee Notional Photographic Interpretation Center� 0200 HOURS 27 OCTOBER 1962 This report is based on relatively complete photo inter- pretation of photography mode on: 14 October 1962 Mission 3101 15 October 1962 Missions 3102 & 3103 17 October 1962 Missions 3104, 3105, 3106, 3107, 3108 & 3109 18 October 1962 Mission 3111 19 October 1962 Missions 3113 & 3114 20 October 1962 Missions 3115, 3116 & 3117 22 October 1962 Missions 3118, 3119 & 3120 23 October 1962 Missions 3121, 3122, 3123, & 5002, 5003, 5004, 5005 & 5006 25 October 1962 Missions 3125, 5007, 5008, 5009, 5011, 5012, 5013, 5014, 5015 Eir 5016 and preliminary analysis of photography of 26 October 1962, Missions 2622, 2623, 2624, 2625 & 2626. TOI----"EGIZET DINAR CHESS Approved for Release: 2025/04/07 C06505270 IrsimmammilaApproved for Release: 2025/04/07 C06505270 VI- ET DINAR CHESS TOP IRONBARK NOTICE Emphasis continues to be placed on the READINESS status, pace of construction and any significant changes at the offensive missile sites in Cuba. This report is based primarily upon detailed analysis of the 25 October low-altitude coverage (see Figure 1). - SUMMARY 1. Detailed analysis confirms the rapid pace of construction reported in our last supplement. As of 25 October there was no evidence indicating , any intention to halt construction, dismantle or move these sites. 2. There are no changes in the dates of estimated operational capability for the MRBM and IRBM sites. Five of the six MRBM sites are now be- lieved to have a full operational capability and the sixth is estimated to achieve this status tomorrow--28 October (see Figure 2). This means a capability to launch up to 24 MRBM (1020 nm) missiles within 6 to 8 hours of a decision to do so, and a refire capabilitk of up to 24 additional MRBMs within 4 to 6 hours (see Table 1). within 3. No additional MRBM missiles, missile transporters, or erectors have been identified (see Table 1). To date, we have observed a total of 33 MRBM missiles. 4. No IRBM missiles, missile transporters, erectors or associated equipment have been observed to date. 5. No new missile sites have been identified; there has been no high- altitude coverage suitable for searching the Remedios area for the suspect second IRBM site since Mission 3118 of 22 October (see Table 1 and Figure 1). TOP ET DINAR CHESS (b)(3) (b)(3) (b)(3) Approved for Release: 2025/04/07 C06505270 Approved for Release: 2025/04/07 C06505270 �7737--SEC�Ra. DONAR CHESS 1RONBARK (b)(1) (b)(3) 18 USC 798 (b)(3) 50 USC 3605 7. Photography (Mission 5012 of 25 October) confirmed the presence of a FROG missile launcher in a vehicle park near Remedios. (The FROG is a tactical unguided rocket of 40,000 to 50,000 yard range, and is similar to the U.S. Honest John). 8. There has been no interdiction of U.S. reconnaissance aircraft. evidence of attempts at (b)(1) 9. Despite Krushchev's statement to Mr. Knox of 24 lack positive evidence that nuclear weapons are deployed 10. The probable nuclear bunkers adjacent to the not yet ready for storage, assembly or checkout. - 2-. DONAR CHESS (b)(3) 50 USC 3605 October, we still in Cuba. MRBM sites are (b)(3) Approved for Release: 2025/04/07 C06505270