Published on CIA FOIA (foia.cia.gov) (https://www.cia.gov/readingroom)


MEMORANDUM FOR THE RECORD - PROJECT CHIGOE

Document Type: 
FOIA [1]
Collection: 
FOIA Collection [2]
Document Number (FOIA) /ESDN (CREST): 
05752611
Release Decision: 
RIPPUB
Original Classification: 
U
Document Page Count: 
9
Document Creation Date: 
March 9, 2023
Document Release Date: 
February 10, 2021
Sequence Number: 
Case Number: 
F-2011-01575
Publication Date: 
April 28, 1966
File: 
AttachmentSize
PDF icon MEMORANDUM FOR THE RECORD[15863378].pdf [3]206.56 KB
Body: 
Approved for Release: 2021/01/11 C05752611 28 April 1966 MEMORANDUM FOR MA RECORD - PROJECT CHIGOE 1. Based on telephone conversation with , (b)(3) the Contractor this date was authorized to proceed on the labor and maintenance necessary to bring the aircraft up to flying condition. Bill stated that Captain Murphy is cranked up to furnish all repair parts other than the engines; Dick Warren will furnish the two engines. 2. Reminded Dave that we still need a priority listing of GFP items. 3. Dave stated that in the meantime, and relying on being covered later, they had already proceeded to do some work on the engines. He stated also that they had accumulated cost for this work separately from the main effort on Phase II. A. I told Dave that the contract for Phase II would be JG-1967, and that JG-1968 would be the contract number for Aircraft Maintenance. Since the bulk of the material will be GFP, the contract will probably be Cost Type with a work order arrangement. He said he would furnish a copy of standard coverage which they have used very successfully. We may con- sider something which would permit up to perhaps a $2,500 ex- penditure at the discretion of the contractor, with greater amounts requiring approval by the Contracting Officer. Approved for Release: 2021/01/11 C05752611 Approved for Release: 2021/01/11 C05752611 /fadF-- SP 2 E7H MAINTENANCE WORK STATEMENT 1. Scope 1.1 This statement of work sets forth all maintenance requirements on one each Navy SP 2 E7H. All work will be of the highest quality and conform to approved directives and Engineering drawings. 1.2 Customer's acceptance of the end product will be accomplished at the Contractor's facility in Greenville, Texas. 1.3 Only qualified personnel will operate the aircraft and/or its equipment. 2. Maintenance Requirements 2.1 Arrival and Receiving 2.1.1 Upon receipt of aircraft at Contractor's facility, the aircraft will be inventoried and records reviewed for inspections due. 2.1.2 All pyrotechnics and related equipment will be removed and properly stored. 2.1.3 All materials will be furnished by the Customer and/or cost reim- bursable. 2.2 Preserving of the Aircraft and Its Systems 2.2.1 The aircraft and its engines will be preserved and maintained in storage in accordance with NAVWEPS 15-01-500 dated 1 June 60, Section V and VI, during maintenance and modification period. 2.2.2. After modification is complete, the aircraft will be,depreServed in accordance with NAVWEPS 15-01-500 dated 1 June 60, Section VII. 2.3 Calendar Inspection 2.3.1 All calendar inspections will be accomplished in accordance with NAVWEPS 01-75 EEB-6 dated 1 Jan 65, change #1 15 Mar 65. The Approved for Release: 2021/01/11 C05752611 Approved for Release: 2021/01/11 C05752611 Look and Do, including lubrication, items will be accomplished. Discrepancies found during these inspections wi.11 be listed and submitted to the Customer for disposition. 2..3.2 The following inspection became due on dates noted and will be accomplished concUrrenctly with the aircraft modification. 2.3.2.1 Odd calendar inspection due 8 Jan 66. 2.3.2.2 Even calendar inspection due 8 Apr 66. 2.3.2.3 All loose equipment will be inspected for condition and serviceability. Discrepancies. found during this in- spection will be listed and submitted to the Customer for disposition. 2.3.3 The following inspection will become due on date indicated and will be accomplished just prior to delivery of subject aircraft to assure the Customer an aircraft that will be operational 90 .days from date Of departure from Contractor's facility. 2.3.3.1 Odd calendar inspection due 8 July 66. r)/ Service Bulletin 2.4.1 The following is a list of aircraft service changes the aircraft records carry as open. These will be worked as directed by the. Customer. 631 640 644 647 650 677 682 PAGE 2 Approved for Release: 2021/01/11 C05752611 Approved for Release: 2021/01/11 C05752611 690 704 708 723 729 730 731 732 734 741 748 757 763 789 790 79)4 800 80)4 830 857 860 891 896 897 905 911 912 913 PAGE 3 Approved for Release: 2021/01/11 C05752611 Approved for Release: 2021/01/11 C05752611 916 917 920 921 922 923 874A 2.4.2 The following is a list of Air Frame Bulletins that the aircraft records carry as open. These will be worked as directed by the Ctstomer. AFB #16 2.4.3 The following is a list of Aircrew System Bulletins that the air� craft records carry as open. These will be worked as directed by the Customer. 3 4 5 6 7 8 9 10 11 12 PAGE 4 Approved for Release: 2021/01/11 C05752611 Approved for Release: 2021/01/11 C05752611 14 15 16 17 18 19 2.4.4 e following is a list of LABS that the aircraft records carry as en. These will be worked as directed by the Customer. 9 10 13 15 18 20 \ 25 2.4.5 The following is a list-\of LGAVBIs that the aircraft records carry as open. These will be worked aS directed by the Customer. 1 4 5 6 7 8 9 -lb 11 PAGE 5 Approved for Release: 2021/01/11 C05752611 Approved for Release: 2021/01/11 C05752611 12 13 14 15 16 17 18 19 20 21 22 23 25 26 28 \ 29 30 31 32 33 34 35 36 37 38 39 40 41 (Some marked NA but not signed off) PAGE 6- Approved for Release: 2021/01/11 C05752611 Approved for Release: 2021/01/11 C05752611 Al]. BVWEPS Avionics Bulletins are open. These will be accomplished as directed by the Customer. 2.4.7 All Service Bulletins received after 27 Apr 66 will be negotiated as to cost and schedule. 2.5 Maintenance of' Engines and Props 2.5.1 Both left and right R-3350 engines Will be removed and replaced with new or overhauled engines. This operation will not neces- sarily be limited to but will include the following. 2.5.1.1 Removal of old engine. 2.5.1.2 Removal of old props. 2.5.1.3 Tear down of old engines and build up of new ones. 2.5.1.5 Preservation and shipment of old engines and props. 2.5.1.6 Installation, rigging, and check out of new engines and Tear down of old props and build up of new ones. props. 2.5.2 Both left and right J-34 Jet Engines will be removed and replaced with new or newly overhauled engines. This operation will not be necessarily limited to but will include the following. 2.5.2.1 2.5.2.2 2.5.2.3 2.5.2.4 Removal of old engines. Tear down of old and build up of new engines. Preservation and shipment of old engine to depot. Installation, rigging and check out of new engines. 2.6 Stripping, Corrosion Control, and Painting of Aircraft 2.6.1 The following operations will be accomplished on the aircraft. 2.6.1.1 All exterior paint will be chemically stripped including the flap bays. 2.6.1.2 Exterior of aircraft will be chemically treated for corrosion. Corrosion found that requires additiohal PAGE 7 Approved for Release: 2021/01/11 C05752611 Approved for Release: 2021/01/11 C05752611 work such as grinding, scraping and/or parts replacement will be a negotiable item of lo.rk. 2.6.1.3 Aircraft will be painted black and marked as directed by the Customer. 2.7 Maintenance Flight Requirements 2.7.1 A functional flight test shall be performed in accordance with 8ection TV of NAVWEPS 01 -75EEB -6 dated 1 Jan 65. It shall in- clude the following. 2.7.1.1 The aircraft compass system will be resmung due to engine changes. 2.7.1.2 Preflight of the aircraft and its systems. 2.7.1.3 Functional test flight to assure all aircraft systems are functioning normally. 2.7.1.4 Postflight of the aircraft and its systems. 2.7.1.5 The Look and Mb phases of all the above operations and inspections are included in the appropriate paragraph. Items of work resulting from these operations and in- spections will be listed and submitted to the Customer for disposition. 3. This statement of work includes the Maintenance Phase only and does not in- clude any part of the Modification Phase although they will be accomplished concurrently. , Xe--6 , .)I 47; C/;-. /'0,--E1(--e.7--7' )70 PAGE 8 Approved for Release: 2021/01/11 C05752611

Source URL: https://www.cia.gov/readingroom/document/05752611

Links
[1] https://www.cia.gov/readingroom/document-type/foia
[2] https://www.cia.gov/readingroom/collection/foia-collection
[3] https://www.cia.gov/readingroom/docs/MEMORANDUM%20FOR%20THE%20RECORD%5B15863378%5D.pdf