Search

Search results

  1. DESTROYER ESCORT (DE) IN SHANG-HAI AREA CHINA

    or the modification of an already existing Riga-class DE. In an attempt to answer these questions, the major shipyards ... for evidence of any modification to an existing Riga-class DE. A search of all available overhead photog- raphy ... a Riga-class DE undergoing modification or a new-class DE in late stages of construction. Objects which re- ...

  2. PANORAMIC STEREO EXPERIMENT (Sanitized) PROJECT 9039

    development STATINTL work was done on =airborne equipment. Camera modification. The =panoramic camera, havi ... because of cloudy weather near the Pacific Coast. Another flight has therefore been scheduled to obtain the Bay Area ...

  3. PANORAMIC STEREO EXPERIMENT

    summarize the work performed by for the Panoramic Stereo Experiment. EQUIPMENT MODIFICATION The_panoramic ... on the same day, but this could not be done because of coudy weather near the coast. On April 26 the third flight ... The camera was immediately repaired and retested, but contin- uously poor weather conditions precluded ...

  4. PANORAMIC STEREO EXPERIMENT FINAL REPORT

    by for the Panoramic Stereo Experiment. EQUIPMENT MODIFICATION The panoramic came r?T~,T~NTL suitable in all respects ... because of coudy weather near the coast. On April 26 the third flight was made. Forty exposures were made ... was immediately repaired and retested, but contin-.4 uously poor weather conditions precluded reflying the Bay ...

  5. SOUTHEAST ASIA ACTIVITY REPORT SELECTED TRANSPORTATION AND INFILTRATION COMPENDIUM ROAD STUDY, ROUTE 7

    7 today is a well-maintained 25X1D road, with sufficient drainage to provide an all-weather capability. ... on the accompanying maps is correct and follows that of the AMS Series L7014 with only slight modification ...

  6. LAUNCH COMPLEX 'E' SURFACE-TO-SURFACE MISSILE FACILITIES KAPUSTIN YAR/VLADIMIROVKA MISSILE TEST CENTER, USSR

    and 4), situated at the terminus of a new all-weather road from Launch Complex "A", is a nearly ... is undergoing modification and expansion, the possibility that this area may have a functional relationship ...

  7. SHUANGCHENGTZU MISSILE TEST CENTER

    No all-weather or hard-surfaced roads connect it with any city. The single-track rail- road serving the SCTMTC ... that it has ever been use.. me extensive modification of Pad B-1 has been in progress, including tie construction ...

  8. GLOSSARY OF NPIC TERMINOLOGY

    70 Over 70 Helicopter Up to 40 41- 60 61-100 Over 100 all-weather road-- An improved road trafficable ... effect. limiting conditions-- Time, weather, and/or man- made factors hindering interpretability ... photo quality, and atmospheric conditions. This type of report is no longer published. modification ...

  9. LAUNCH COMPLEX 'G' SURFACE-TO-SURFACE MISSILE FACILITIES KAPUSTIN YAR/VLADIMIROVKA MISSILE TEST CENTER, USSR

    of 200 nautical miles, and a further modification, 25X1 D known as the Korolov missile,-long, ... ALL-WEATHER ROAD SCAR (UNDER CONSTRUCTION) ~ EXCAVATION TO LAUNCH AREA 7G ^ ~ 20' X 10' \ / ~~i ... RDP78T04751A000100010013-0 25X1C NOFORN PIC/JR-1006/61 of the all-weather road under construction to the launch areas. ...

  10. NEGOTIATED CONTRACT

    DISPOSE ` / OF THE RETURN OR P MENT'S I) EFFECT REPAIRS OR MODIFICATIONS. UPON COMPLETION OF (1) ... PROVISION AFFECTED BY THE RETURN OR DI5- POSITIONj, OR THE REPAIR OR MODIFICATION,, IN ACCORDANCE ...

  11. PROPOSAL FOR DEVELOPMENT OF CHANGE-DETECTOR EQUIPMENT

    now move constantly, employing camouflage, night, or bad weather to avoid detection. Thus, the timely ...

  12. PRELIMINARY REPORT OF MISSION ODE- 8009

    OF THE DIMENSIONS BEING 20 TO 25 PERCENT LARGER, AND A FEW DESIGN MODIFICATIONS THE AIRPLANE RESEMBLES BACKFIN. ... RUNWAY, SNOW-COVERED. ADJACENT STRIP MAY BE GRAVEL OR SOD AND APPEARS TO BE AN ALTERNATE FOR BAD-WEATHER ...