Search

Search results

  1. PROJECT AIRCRAFT ASSIGNMENT

    MEMORANDUM FOR: Project Director SUBJECT: Project Aircraft Assignment 1. This memorandum outlines the overall ... Project aircraft situation and contains Operations recommendations for their assignment and utiliza- tion. ... The following figures are based on the assumption that all ten Project retained U-2 aircraft will be equipped ...

  2. NEGOTIATION AUTHORITY IN CONNECTION WITH PROJECT (Sanitized) (RAINBOW)

    June 1957 SUBJECT s Negotiation Authority in Connection with Project [RAINBOW). direct you i 25X1A ... 25X1A?':lectric Corporation, timore, (1) to negotiate contracts and related documents in connection with Project ... (RAINBOW) with Westinghouse 25X1 A (2) after appropriate Wroval of such contracts RICH;} M. BIS LL* JR. ...

  3. CONCURRENCE IN LETTER CONTRACT NO. BE-2022 WITH WESTINGHOUSE ELECTRIC CORPORATION, BALTIMORE, MD. PROJECT RAINBOW.

    under project RAINBOW. 3. The letter contract obligates 00 chargeable to Fiscal Year 1 9 5 7 A A funds ... s Concurrence in Letter Contract No. 29-2022 with Westinghouse Electric Corporation, Baltimore, Md. Project ... RAINBOW. 1. This me* randum contains a recommendation submitted for approval of the Director of Central ...

  4. SLIPPER TANK INSTALLATION ON U-2 AIRCRAFT

    for THERMOS would cause acme cost increase. U.2 344 is presently equipped with acceptable RAINBOW and will ... need slipper tanks that have been RAINBOW covered prior to shipment. LAC affirms this is feasible ... and practicable and that RAINBOW representative at each detachment is capable of adapting the RAINBOW installation ...

  5. CONCURRENCE IN DEFINITIVE CONTRACT NO. TE-2191 WITH EDGERTON, GERMESHAUSEN AND GRIER, INC., LAS VEGAS, NEVADA, (SANITIZED) PROJECT AQUATONE (RAINBOW)

    end Grier, Inc., Las Vegas, Nevada, Project AQUATONE (RAINBOW). 1. This memorandum contains ... obligate $184,800 of FY IL958 AQUATONE (RAINBOW) funds subject to decrease if negotiations result ... the Project Comptroller signifies that sufficient funds are available for this additional obligation. 4. ...

  6. PLANS FOR AQUATONE/OILSTONE AFTER PRESENT OPERATIONAL SEASON

    thereafter. At the 6 May meeting on this. Project we received some guidance on this matter in the form of two ... in this Project to the Air Force to be added to the military U-2 capability being developed by SAC. Second, ... from interception through the 1958 season, especially if the RAINBOW development turns out to be reasonably ...

  7. STATUS OF PROJECT AQUATONE

    January 1957 SUBJECT: Status of Project AQUATONE 1. We do not seem to be making much progress with AQUA ... this Project has undergone a marked change since mid-autumn from one of full and open support and partnership ... having a major effect on the morale of the personnel assigned to this Project. The fact that a definitive meeting ...

  8. PROJECT AQUATONE- OPERATIONAL CONCEPT

    For Releas 31t y? A-RDP62R844R0003O I l S~, 1958 TAT J PROJECT AQUATONE- OPERATIONAL CONCEPT 1. Objectives: ... c. Restrictions: RAINBOW covered aircraft will be employed on all missions with the exception of two ... Equipment: Five U-2 aircraft without RAINBOW covering are presently deployed; two in the Far East and three ...

  9. CONTRACTING OFFICER S DETERMINATIONS AND FINDINGS AUTHORITY TO NEGOTIATE CONTRACT

    Las Vegas. Nevada, for studies in the field of I hereby find that this procurement, Project AQUATONE ... (RAINBOW) is estimated to cost 1369,338.97 and is chargeable to Fiscal Year 1c)'S8 d is for studies ... and that the proposed contract must necessarily be negotiated without formal advertising. Project Contracting Officer ...

  10. CONCURRENCE IN AMENDMENT NO. 2 TO CONTRACT NO. BE-2022 WITH WESTINGHOUSE ELECTRIC CORPORATION, PROJECT (Sanitized) (RAINBOW).

    concurrence in Aunt No. 2 to Contract No. B wltn xeetingLiouse Llectric Corporation, Project (RAINBOW). 1. ... This memorandum contains a recommendation submitted for approval of the Project Director. Such recommendation ... tractor and has shown considerable interest in the project, the termination provision is considered ...

  11. AQUATONE PLANS

    about the evolution and termination of this project after next fall. The basic planning decision is whether the Agency ... with the RAINBOW program. I am now reasonably confident that we will be able by the time we see the President ... higher next season than this. Accordingly, RAINBOW improves the chances for operations this season ...

  12. CONCURRENCE IN DEFINITIVE CONTRACT NO. BE-2022 WITH WESTINGHOUSE ELECTRIC CORPORATION, PROJECT (Sanitized) (RAINBOW)

    radiation in connection with Project RAINBOW. 3. The letter contract obligated $150,000 chargeable to Fiscal ... Contract No BE-2022 with Westinghouse Electric Corporation, Project (RAINBBOW). 1. This memorandum contains ... a recommendation,eubmitted for approval of the Project Director. Such recd endation is set forth in Paragraph 5. 2. ...

  13. NOTES FOR MEETING WITH GENERAL TWINING

    only to the following limitations; a. If one or more of the most remote areas could not be reached with RAINBOW covered ... That we have permission to proceed with operations against all target areas reachable with RAINBOW_covered aircraft ... RICHARD M. BISSELL, J Project Director '4111, 464U, =s 25X1A9a Approved For Release 2001/03/30: ...

  14. CONCURRENCE IN LETTER CONTRACT NO. TE-2191 WITH EDGERTON, GERMESHAUSEN AND GRIER, INC. LAS VEGAS, NEVADA PROJECT AQUATONE (RAINBOW) (SANITIZED)

    Project AQUAT01 (Rainbow) 1. This memorandum contains are Lion submitted for approval of the Director ... Contracting Officer is reoonmsnded. a L,. S/DCI- Project Director CONCt?NCES $ Approval requested in Paragraph ...

  15. PROJECT AQUATONE OPERATIONAL CONCEPT- WINTER/ SPRING 1958

    for this purpose or incurring additional risks. 2. Restrictions: a. RAINBOW covered aircraft will be employed ... after operations have been initiated. c. Operations will be initiated as soon as RAINBOW equipped aircraft ... as second choice WHITE SEA Area-- April through June 4. Equipment: Two aircraft without RAINBOW covering ...

  16. PROJECT AQUATONE OPERATIONAL CONCEPT- WINTER/ SPRING 1958

    of missions for this purpose or incurring additional risks. 2. Restrictions: a. RAINBOW covered aircraft will ... as feasible after operations have been initiated. c. Operations will be initiated as soon as RAINBOW equipped ... through June 4. Equipment: Two aircraft without RAINBOW covering are already in place in the Far East and three ...

  17. CONCURRENCE IN DEFINITIVE CONTRACT NO. (Sanitized) WITH (Sanitized) (RAINBOW)

    from Fiscal Year 1957 AQUATONE (RAINBOW) concurrence to this memorsium, the Project Comptroller sig ... and investigations.ectroagrItic radiaion in connection with Project ill perform certain of these studies at-46 will obtain certain ... services and from other competent sources approved mated Project 3cAentific Officer, No. Sep 9 in the field ...

  18. MEETING WITH GENERAL GOODPASTER, 15 JULY 1957

    covered were the following: 1. Kamchatka Mission. 2. Plans for Siberian Missions. 3. Status of the RAINBOW ... 25X1A RICHARD M. ZISSELL, JR. Project D rector RMB;gjg (22 July 57) Di tribution: opy 1-Proj Dir 2-Dep ...

  19. MEETING WITH GENERAL GOODPASTER, 15 JULY 1957

    were the fottowing 1. Kamchatka 4 Plans for Siberian Missions. RAINBOW Program. Recent Crashes at Del Rio. S. ter ... Capability. y/Air Force Views on Developing of a U-Z /5/ RICHARD U. BELL, JR. Project Director RMB:gjg (2 Juty ...

  20. (U) MINUTES OF PASSIVE ECM COMMITTEE

    C. 2 Incls NORMAN C. APPOLD 1. Minutes of Colonel, USAF Meeting Chief, Special Project Office 2. ... camouflage program. c. Review of the Lincoln Laboratory effort on RAINBOW (Confidential Title) including ... from the Polaroid Corporation; (3) progress at Lockheed Aircraft Corporation with RAINBOW (Confidential Title) ...

Pages